Hand-curated · public source on every row

The US data center map, with the power numbers.

156 hyperscale, AI and major colocation campuses across 35 states. See what is operating, what is under construction and what is planned, with the operator, county and megawatts behind each site.

156
data center campuses
64,662
MW disclosed
55
planned or under construction
101
operating

Live map

Every tracked US data center

Marker size follows power in MW. The ring shows status: operating, under construction or planned. Click a marker for the operator and capacity.

Open the full map with filters and grid operator overlays →

The pipeline

Planned and under construction

55 campuses are announced, planned or being built, with 37,536 MW of disclosed power between them. This is the load utilities and grid operators are planning around.

CampusOperatorLocationCountyPowerInvestmentStatusAnnouncedYearSource
Fermi America Project MatadorFermi AmericaCarson County, TXCarson County11,000 MW—AnnouncedJun 26, 20252027source ↗
Meta Richland Parish (Hyperion)MetaRichland Parish, LARichland Parish5,000 MW$50BUnder constructionDec 4, 20242030source ↗
AWS Northern Indiana / Hobart CampusesAmazon Web ServicesNorthern Indiana / Hobart, INLake County2,400 MW—PlannedNov 24, 2025—source ↗
Stargate Doña Ana County (Project Jupiter)OpenAI / Oracle / STACKDoña Ana County, NMDoña Ana County2,200 MW—Under constructionSep 23, 20252028source ↗
Stargate Shackelford County (Vantage Frontier)Vantage / Oracle / OpenAIShackelford County, TXShackelford County1,400 MW$25BUnder constructionJul 24, 20252026source ↗
IREN Sweetwater 1IRENSweetwater, TXFisher County1,400 MW—Under construction—2027source ↗
Stargate Saline Township (Related Digital)Related Digital / Oracle / OpenAISaline Township, MIWashtenaw County~1,400 MW—Under constructionOct 30, 20252028source ↗
Nscale Monarch AI CampusNscale / MicrosoftMason County, WVMason County1,350 MW—PlannedAug 16, 20232027source ↗
Stargate Port Washington (Vantage Lighthouse)Vantage / Oracle / OpenAIPort Washington, WIOzaukee County~1,300 MW$15BUnder constructionJun 11, 20252028source ↗
Google New FlorenceGoogleNew Florence, MOMontgomery County1,200 MW$15BPlannedMay 20, 20262028source ↗
Stargate Milam CountyOpenAI / SB EnergyMilam County, TXMilam County~1,200 MW—Under constructionSep 23, 20252028source ↗
Meta El PasoMetaEl Paso, TXEl Paso County1,000 MW$14BUnder constructionDec 4, 20232028source ↗
Meta LebanonMetaLebanon, INBoone County1,000 MW$10BUnder constructionNov 25, 2024—source ↗
CleanArc VA1CleanArcCaroline County, VACaroline County900 MW—Under constructionNov 21, 20242028source ↗
xAI Colossus 3xAIMemphis, TNShelby County850 MW—PlannedDec 30, 20252027source ↗
Meta RosemountMetaRosemount, MNDakota County750 MW—Under constructionMar 14, 20242026source ↗
Penzance Bedington CampusPenzance ManagementBerkeley County, WVBerkeley County600 MW—PlannedFeb 26, 2026—source ↗
Aligned Project CaprockAligned Data CentersHale County, TXHale County540 MW—Under constructionFeb 27, 20262027source ↗
Google Kansas City Northland Campus (Project Mica, Rocky Branch Creek)GoogleKansas City, MOClay County500 MW$10BUnder constructionApr 26, 20222027source ↗
AWS Madison County MSAmazon Web ServicesMadison County, MSMadison County500 MW—PlannedJan 25, 20242027source ↗
CoreWeave LancasterCoreWeaveLancaster County, PALancaster County300 MW$6BPlannedJul 16, 2025—source ↗
Nebius VinelandNebius / DataOneVineland, NJCumberland County300 MW—Under constructionMar 5, 20252026source ↗
Tract Reno CampusTractReno, NVWashoe County250 MW—PlannedOct 3, 20232027source ↗
Google LaGrangeGoogleLaGrange, GATroup County100 MW—PlannedApr 21, 2026—source ↗
Microsoft Alviso / San JoseMicrosoftSan Jose, CASanta Clara County48 MW—Under constructionSep 29, 20172028source ↗
STACK Infrastructure ATL02 (Lithia Springs)Stack InfrastructureLithia Springs, GADouglas County48 MW—Under constructionOct 16, 20232027source ↗
AWS Salem Township (Susquehanna)Amazon Web ServicesSalem Township, PALuzerne County—$20BPlannedMar 4, 2024—source ↗
AWS Northwest Louisiana CampusesAmazon Web Services / STACKCaddo and Bossier Parishes, LACaddo Parish—$18BPlannedFeb 23, 2026—source ↗
AWS Georgia (Butts / Douglas Counties)Amazon Web ServicesButts County, GAButts County—$11BPlannedJan 7, 2025—source ↗
AWS Montgomery County Missouri CampusAmazon Web ServicesMontgomery County, MOMontgomery County—$10BPlanned——source ↗
AWS Richmond County (Energy Way)Amazon Web ServicesHamlet, NCRichmond County—$10BUnder constructionJun 4, 2025—source ↗
Google West MemphisGoogleWest Memphis, ARCrittenden County—$4BPlannedOct 2, 20252027source ↗
Meta MontgomeryMetaMontgomery, ALMontgomery County—$1.5BUnder constructionMay 2, 2024—source ↗
Google Kansas City (Project Shale, Hunt Midwest Business Center)GoogleKansas City, MOClay County—$1BUnder constructionMar 20, 2024—source ↗
Meta TulsaMetaTulsa, OKTulsa County—$1BUnder constructionMar 8, 2024—source ↗
Meta Beaver DamMetaBeaver Dam, WIDodge County—$1BUnder constructionFeb 20252027source ↗
Google Michigan CityGoogleMichigan City, INLaPorte County—$832MUnder constructionJul 2025—source ↗
Meta JeffersonvilleMetaJeffersonville, INClark County—$800MUnder constructionJan 25, 2024—source ↗
Meta Bowling GreenMetaBowling Green, OHWood County—$800MUnder construction——source ↗
Meta AikenMetaAiken, SCAiken County—$800MUnder constructionAug 29, 2024—source ↗
Meta CheyenneMetaCheyenne, WYLaramie County—$800MUnder constructionNov 7, 2023—source ↗
Google LincolnGoogleLincoln, NELancaster County—$600MPlanned——source ↗
Google Cedar RapidsGoogleCedar Rapids, IALinn County—$576MPlannedFeb 2024—source ↗
Google HermantownGoogleHermantown, MNSt. Louis County——Planned——source ↗
Google Pine IslandGooglePine Island, MNGoodhue County——PlannedOct 7, 2025—source ↗
Google Muskogee CountyGoogleMuskogee County, OKMuskogee County——Under construction2025—source ↗
Google StillwaterGoogleStillwater, OKPayne County——Planned2025—source ↗
Google Dorchester CountyGoogleDorchester County, SCDorchester County——Under constructionSep 26, 2024—source ↗
Google Armstrong CountyGoogleArmstrong County, TXArmstrong County——Planned2025—source ↗
Google Haskell CountyGoogleHaskell County, TXHaskell County——Planned2025—source ↗
Google Pampa (Meitner Energy Center)GooglePampa, TXGray County——Under construction2026—source ↗
Google Wilbarger CountyGoogleWilbarger County, TXWilbarger County——PlannedFeb 24, 2026—source ↗
Google Chesterfield CountyGoogleChesterfield County, VAChesterfield County——PlannedAug 27, 2025—source ↗
Microsoft Kenosha (I-94 / Highway 142)MicrosoftKenosha, WIKenosha County——PlannedJan 27, 2025—source ↗
Stargate Lordstown (SoftBank / Foxconn)SoftBank / OpenAI / FoxconnLordstown, OHTrumbull County——PlannedSep 23, 20252026source ↗

By state

Data centers by state

Jump to a state's own data center map and full campus list.

Texas

24 campuses · 19,777 MW disclosed · 10 in the pipeline

Virginia

16 campuses · 4,498 MW disclosed · 2 in the pipeline

California

8 campuses · 293 MW disclosed · 1 in the pipeline

Georgia

8 campuses · 608 MW disclosed · 3 in the pipeline

Arizona

6 campuses · 1,610 MW disclosed · 0 in the pipeline

Illinois

6 campuses · 793 MW disclosed · 0 in the pipeline

Indiana

6 campuses · 5,600 MW disclosed · 4 in the pipeline

Ohio

6 campuses · 1,922 MW disclosed · 2 in the pipeline

Iowa

5 campuses · 1,600 MW disclosed · 1 in the pipeline

Missouri

5 campuses · 2,200 MW disclosed · 4 in the pipeline

Nevada

5 campuses · 1,825 MW disclosed · 1 in the pipeline

Oregon

5 campuses · 1,600 MW disclosed · 0 in the pipeline

North Carolina

4 campuses · 700 MW disclosed · 1 in the pipeline

Nebraska

4 campuses · 450 MW disclosed · 1 in the pipeline

Oklahoma

4 campuses · 350 MW disclosed · 3 in the pipeline

Tennessee

4 campuses · 1,590 MW disclosed · 1 in the pipeline

Wisconsin

4 campuses · 2,050 MW disclosed · 3 in the pipeline

Alabama

3 campuses · 250 MW disclosed · 1 in the pipeline

Minnesota

3 campuses · 750 MW disclosed · 3 in the pipeline

New Jersey

3 campuses · 355 MW disclosed · 1 in the pipeline

South Carolina

3 campuses · 200 MW disclosed · 2 in the pipeline

Utah

3 campuses · 1,120 MW disclosed · 0 in the pipeline

Washington

3 campuses · 560 MW disclosed · 0 in the pipeline

Louisiana

2 campuses · 5,000 MW disclosed · 2 in the pipeline

Mississippi

2 campuses · 1,500 MW disclosed · 1 in the pipeline

New Mexico

2 campuses · 2,600 MW disclosed · 1 in the pipeline

Pennsylvania

2 campuses · 300 MW disclosed · 2 in the pipeline

West Virginia

2 campuses · 1,950 MW disclosed · 2 in the pipeline

Wyoming

2 campuses · 280 MW disclosed · 1 in the pipeline

Arkansas

1 campus · 0 MW disclosed · 1 in the pipeline

Florida

1 campus · 17 MW disclosed · 0 in the pipeline

Idaho

1 campus · 500 MW disclosed · 0 in the pipeline

Michigan

1 campus · 1,400 MW disclosed · 1 in the pipeline

North Dakota

1 campus · 400 MW disclosed · 0 in the pipeline

New York

1 campus · 14 MW disclosed · 0 in the pipeline

By operator

Who is building

The largest tracked portfolios. Each links to that operator's full project list.

Free sample — the 100 largest tracked projects

Every column we publish: operator, city, capacity (MW/MWh), status, year online and a public source on each row. Opens straight in Excel or Sheets. No card, no call.

One email with the file. No list, no drip sequence — see our privacy policy.

Working this market? Get every operator below as a ranked BD hunting list (Excel + CSV + GeoJSON) — $199 once, or $49/mo refreshed monthly with a row-level change log.
See data & pricing →

All 156 tracked data centers

Ranked by disclosed power. Power is shown for 112 of 156 campuses; a tilde marks an estimate, and a dash means the operator has not published a figure.

CampusOperatorLocationCountyPowerInvestmentStatusAnnouncedYearSource
Fermi America Project MatadorFermi AmericaCarson County, TXCarson County11,000 MW—AnnouncedJun 26, 20252027source ↗
Meta Richland Parish (Hyperion)MetaRichland Parish, LARichland Parish5,000 MW$50BUnder constructionDec 4, 20242030source ↗
AWS Northern Indiana / Hobart CampusesAmazon Web ServicesNorthern Indiana / Hobart, INLake County2,400 MW—PlannedNov 24, 2025—source ↗
AWS Project Rainier (New Carlisle)Amazon Web ServicesNew Carlisle, INSt. Joseph County2,200 MW$11BOperatingApr 25, 20242025source ↗
Stargate Doña Ana County (Project Jupiter)OpenAI / Oracle / STACKDoña Ana County, NMDoña Ana County2,200 MW—Under constructionSep 23, 20252028source ↗
Stargate Shackelford County (Vantage Frontier)Vantage / Oracle / OpenAIShackelford County, TXShackelford County1,400 MW$25BUnder constructionJul 24, 20252026source ↗
IREN Sweetwater 1IRENSweetwater, TXFisher County1,400 MW—Under construction—2027source ↗
Stargate Saline Township (Related Digital)Related Digital / Oracle / OpenAISaline Township, MIWashtenaw County~1,400 MW—Under constructionOct 30, 20252028source ↗
Nscale Monarch AI CampusNscale / MicrosoftMason County, WVMason County1,350 MW—PlannedAug 16, 20232027source ↗
Stargate Port Washington (Vantage Lighthouse)Vantage / Oracle / OpenAIPort Washington, WIOzaukee County~1,300 MW$15BUnder constructionJun 11, 20252028source ↗
Google New FlorenceGoogleNew Florence, MOMontgomery County1,200 MW$15BPlannedMay 20, 20262028source ↗
Stargate AbileneOracle / Crusoe / OpenAIAbilene, TXTaylor County1,200 MW—OperatingJul 18, 20242025source ↗
Stargate Milam CountyOpenAI / SB EnergyMilam County, TXMilam County~1,200 MW—Under constructionSep 23, 20252028source ↗
xAI Colossus 2xAISouthaven, MSDeSoto County~1,000 MW$20BOperatingMar 7, 20252025source ↗
Meta El PasoMetaEl Paso, TXEl Paso County1,000 MW$14BUnder constructionDec 4, 20232028source ↗
Meta LebanonMetaLebanon, INBoone County1,000 MW$10BUnder constructionNov 25, 2024—source ↗
Meta PrometheusMetaNew Albany, OHFranklin County1,000 MW—OperatingAug 15, 20172025source ↗
Meta Eagle MountainMetaEagle Mountain, UTUtah County970 MW—OperatingMay 30, 20182018source ↗
CleanArc VA1CleanArcCaroline County, VACaroline County900 MW—Under constructionNov 21, 20242028source ↗
xAI Colossus 3xAIMemphis, TNShelby County850 MW—PlannedDec 30, 20252027source ↗
AWS US-East-1 (Ashburn cluster)Amazon Web ServicesAshburn, VALoudoun County800 MW—Operating—2006source ↗
Meta HenricoMetaSandston, VAHenrico County~800 MW—OperatingOct 5, 20172020source ↗
Meta RosemountMetaRosemount, MNDakota County750 MW—Under constructionMar 14, 20242026source ↗
Microsoft Fairwater (Mount Pleasant)MicrosoftMount Pleasant, WIRacine County750 MW—Operating—2026source ↗
Switch CitadelSwitchTahoe Reno, NVStorey County650 MW—OperatingJan 15, 20152018source ↗
Microsoft BoydtonMicrosoftBoydton, VAMecklenburg County600 MW—OperatingAug 27, 20102010source ↗
Google Council BluffsGoogleCouncil Bluffs, IAPottawattamie County600 MW—OperatingJun 19, 20072009source ↗
Penzance Bedington CampusPenzance ManagementBerkeley County, WVBerkeley County600 MW—PlannedFeb 26, 2026—source ↗
Google MesaGoogleMesa, AZMaricopa County~600 MW—OperatingJul 1, 20192025source ↗
Microsoft West Des MoinesMicrosoftWest Des Moines, IAPolk County600 MW—OperatingAug 21, 20082014source ↗
Aligned Project CaprockAligned Data CentersHale County, TXHale County540 MW—Under constructionFeb 27, 20262027source ↗
Google Kansas City Northland Campus (Project Mica, Rocky Branch Creek)GoogleKansas City, MOClay County500 MW$10BUnder constructionApr 26, 20222027source ↗
Meta PrinevilleMetaPrineville, ORCrook County500 MW—OperatingJan 21, 20102011source ↗
Meta KunaMetaKuna, IDAda County~500 MW—OperatingFeb 16, 20222026source ↗
Meta DeKalbMetaDeKalb, ILDeKalb County500 MW—OperatingJun 30, 20202023source ↗
AWS ManassasAmazon Web ServicesManassas, VAManassas city500 MW—Operating—2014source ↗
AWS Madison County MSAmazon Web ServicesMadison County, MSMadison County500 MW—PlannedJan 25, 20242027source ↗
Google ColumbusGoogleColumbus, OHFranklin County~500 MW—OperatingMar 20212024source ↗
Meta Kansas CityMetaKansas City, MOPlatte County~500 MW—OperatingMar 11, 20222025source ↗
Microsoft GoodyearMicrosoftGoodyear, AZMaricopa County480 MW—OperatingApr 20192022source ↗
Microsoft QuincyMicrosoftQuincy, WAGrant County470 MW—OperatingJan 15, 20062007source ↗
Meta Sarpy CountyMetaPapillion, NESarpy County450 MW—OperatingApr 6, 20172020source ↗
AWS HilliardAmazon Web ServicesHilliard, OHFranklin County400 MW—OperatingSep 20142016source ↗
Google Storey CountyGoogleStorey County, NVStorey County400 MW—OperatingApr 17, 20172021source ↗
Microsoft San AntonioMicrosoftSan Antonio, TXBexar County400 MW—OperatingJan 19, 20072008source ↗
Meta TempleMetaTemple, TXBell County400 MW—OperatingMar 31, 20222022source ↗
Meta GallatinMetaGallatin, TNSumner County~400 MW—OperatingAug 12, 20202024source ↗
Meta Los LunasMetaLos Lunas, NMValencia County400 MW—OperatingJul 9, 20162019source ↗
Apple WaukeeAppleWaukee, IADallas County~400 MW—OperatingAug 24, 20172024source ↗
Google MidlothianGoogleMidlothian, TXEllis County~400 MW—OperatingAug 1, 20182020source ↗
Meta Newton CountyMetaNewton County, GANewton County400 MW—OperatingMar 7, 20182018source ↗
Applied Digital Polaris Forge 1Applied Digital / CoreWeaveEllendale, NDDickey County400 MW—Operating—2025source ↗
Google The DallesGoogleThe Dalles, ORWasco County350 MW—OperatingFeb 18, 20052006source ↗
Meta Forest CityMetaForest City, NCRutherford County350 MW—OperatingNov 11, 20102012source ↗
Google HendersonGoogleHenderson, NVClark County350 MW—OperatingNov 15, 20182020source ↗
Google PryorGooglePryor, OKMayes County350 MW—OperatingMay 20072011source ↗
Microsoft El MirageMicrosoftEl Mirage, AZMaricopa County350 MW—OperatingMay 2, 20192023source ↗
xAI Colossus 1xAIMemphis, TNShelby County~340 MW—OperatingJun 5, 20242024source ↗
CoreWeave LancasterCoreWeaveLancaster County, PALancaster County300 MW$6BPlannedJul 16, 2025—source ↗
AWS HermistonAmazon Web ServicesHermiston, ORUmatilla County300 MW—OperatingMar 19, 20172018source ↗
Nebius VinelandNebius / DataOneVineland, NJCumberland County300 MW—Under constructionMar 5, 20252026source ↗
Compass Red OakCompass Data CentersRed Oak, TXEllis County280 MW—OperatingJan 29, 20202020source ↗
Microsoft Cheyenne (Business Parkway / Bison Business Park)MicrosoftCheyenne, WYLaramie County280 MW—OperatingApr 9, 20122012source ↗
QTS AshburnQTS / BlackstoneAshburn, VALoudoun County250 MW—OperatingOct 25, 20172017source ↗
Google LenoirGoogleLenoir, NCCaldwell County250 MW—OperatingJan 19, 20072008source ↗
CoreWeave PlanoCoreWeavePlano, TXCollin County250 MW—OperatingJul 26, 20232024source ↗
AWS BoardmanAmazon Web ServicesBoardman, ORMorrow County250 MW—OperatingNov 7, 20082014source ↗
Google BridgeportGoogleBridgeport, ALJackson County250 MW—OperatingJun 24, 20152023source ↗
Tract Reno CampusTractReno, NVWashoe County250 MW—PlannedOct 3, 20232027source ↗
Stack Infrastructure ManassasStack InfrastructureManassas, VAManassas city220 MW—OperatingJan 22, 20202022source ↗
Google Moncks CornerGoogleMoncks Corner, SCBerkeley County200 MW—OperatingApr 4, 20072013source ↗
Apple PrinevilleApplePrineville, ORCrook County200 MW—OperatingDec 20112014source ↗
Apple RenoAppleReno, NVWashoe County175 MW—OperatingJun 26, 20122013source ↗
Iron Mountain VA-1 ManassasIron MountainManassas, VAManassas city142 MW—OperatingMar 9, 20162017source ↗
Aligned West JordanAligned Data CentersWest Jordan, UTSalt Lake County120 MW—OperatingMar 22, 20182021source ↗
Apple MaidenAppleMaiden, NCCatawba County100 MW—OperatingJun 3, 20092011source ↗
Google LaGrangeGoogleLaGrange, GATroup County100 MW—PlannedApr 21, 2026—source ↗
Apple MesaAppleMesa, AZMaricopa County100 MW—OperatingFeb 2, 20152017source ↗
Digital Realty Lakeside (350 E Cermak)Digital RealtyChicago, ILCook County100 MW—Operating—1999source ↗
Digital Realty ManassasDigital RealtyManassas, VAManassas city90 MW—OperatingJul 26, 20182018source ↗
CyrusOne SterlingCyrusOneSterling, VALoudoun County90 MW—Operating—2017source ↗
Digital Realty GarlandDigital RealtyGarland, TXDallas County80 MW—OperatingAug 25, 20172019source ↗
CyrusOne PhoenixCyrusOneChandler, AZMaricopa County80 MW—OperatingSep 20112016source ↗
NTT RagingWire SacramentoNTT Global Data CentersSacramento, CASacramento County80 MW—Operating—2017source ↗
Stack Infrastructure San JoseStack InfrastructureSan Jose, CASanta Clara County80 MW—OperatingJan 16, 20202021source ↗
CyrusOne San AntonioCyrusOneSan Antonio, TXBexar County70 MW—OperatingDec 23, 20112014source ↗
Digital Realty NorthlakeDigital RealtyNorthlake, ILCook County65 MW—OperatingOct 24, 20172017source ↗
NTT GarlandNTT Global Data CentersGarland, TXDallas County65 MW—OperatingAug 20, 20152018source ↗
Vantage QuincyVantage Data CentersQuincy, WAGrant County60 MW—OperatingSep 27, 20112019source ↗
CyrusOne Aurora (CHI1, former CME data center)CyrusOneAurora, ILDuPage County60 MW—Operating—2009source ↗
Digital Realty Piscataway Campus (3 Corporate Place / 365 S Randolphville Rd)Digital RealtyPiscataway, NJMiddlesex County55 MW—Operating——source ↗
Lambda AllenLambda LabsAllen, TXCollin County50 MW—Operating—2024source ↗
Microsoft Alviso / San JoseMicrosoftSan Jose, CASanta Clara County48 MW—Under constructionSep 29, 20172028source ↗
STACK Infrastructure ATL02 (Lithia Springs)Stack InfrastructureLithia Springs, GADouglas County48 MW—Under constructionOct 16, 20232027source ↗
Equinix DA11 DallasEquinixDallas, TXDallas County42 MW—OperatingFeb 21, 20192020source ↗
Equinix CH4 ChicagoEquinixChicago, ILCook County40 MW—OperatingJul 15, 20092017source ↗
DataBank ATL2DataBankAtlanta, GAFulton County40 MW—Operating——source ↗
Equinix SV10 Silicon ValleyEquinixSan Jose, CASanta Clara County36 MW—OperatingJun 14, 20162019source ↗
Equinix DC12 AshburnEquinixAshburn, VALoudoun County30 MW—OperatingAug 3, 20162018source ↗
Equinix DC10 AshburnEquinixAshburn, VALoudoun County30 MW—OperatingJul 27, 20112016source ↗
Digital Realty Westin SeattleDigital RealtySeattle, WAKing County30 MW—Operating—1997source ↗
DataBank SLC1DataBankSalt Lake City, UTSalt Lake County30 MW—OperatingJan 17, 20172017source ↗
Equinix DC1 AshburnEquinixAshburn, VALoudoun County28 MW—Operating—2000source ↗
Equinix CH3 ChicagoEquinixElk Grove Village, ILCook County28 MW—Operating—2014source ↗
CoreSite SV4 Santa ClaraCoreSiteSanta Clara, CASanta Clara County24 MW—Operating—2013source ↗
Cologix COL1 ColumbusCologixColumbus, OHFranklin County22 MW—OperatingFeb 4, 20142018source ↗
Equinix AT1 AtlantaEquinixAtlanta, GAFulton County20 MW—Operating—2010source ↗
Equinix SV1 San JoseEquinixSan Jose, CASanta Clara County18 MW—Operating—2001source ↗
CoreSite VA1 RestonCoreSiteReston, VAFairfax County18 MW—Operating—2010source ↗
Equinix MI1 Miami (NAP of the Americas)EquinixMiami, FLMiami-Dade County17 MW—Operating—2001source ↗
CoreSite NY1 New YorkCoreSiteNew York, NYNew York County14 MW—Operating—2008source ↗
DataBank SAN1DataBankSan Diego, CASan Diego County7 MW—Operating——source ↗
AWS Salem Township (Susquehanna)Amazon Web ServicesSalem Township, PALuzerne County—$20BPlannedMar 4, 2024—source ↗
AWS Northwest Louisiana CampusesAmazon Web Services / STACKCaddo and Bossier Parishes, LACaddo Parish—$18BPlannedFeb 23, 2026—source ↗
AWS Georgia (Butts / Douglas Counties)Amazon Web ServicesButts County, GAButts County—$11BPlannedJan 7, 2025—source ↗
AWS Montgomery County Missouri CampusAmazon Web ServicesMontgomery County, MOMontgomery County—$10BPlanned——source ↗
AWS Richmond County (Energy Way)Amazon Web ServicesHamlet, NCRichmond County—$10BUnder constructionJun 4, 2025—source ↗
Google West MemphisGoogleWest Memphis, ARCrittenden County—$4BPlannedOct 2, 20252027source ↗
Meta AltoonaMetaAltoona, IAPolk County—$2.5BOperatingJun 25, 2012—source ↗
Google Fort WayneGoogleFort Wayne, INAllen County—$2BOperatingOct 9, 20232025source ↗
Meta HuntsvilleMetaHuntsville, ALMadison County—$1.5BOperatingJun 14, 2018—source ↗
Meta MontgomeryMetaMontgomery, ALMontgomery County—$1.5BUnder constructionMay 2, 2024—source ↗
Meta Fort WorthMetaFort Worth, TXTarrant County—$1.5BOperatingMay 22, 2015—source ↗
Meta MesaMetaMesa, AZMaricopa County—$1BOperatingMay 20212025source ↗
Google Kansas City (Project Shale, Hunt Midwest Business Center)GoogleKansas City, MOClay County—$1BUnder constructionMar 20, 2024—source ↗
Meta TulsaMetaTulsa, OKTulsa County—$1BUnder constructionMar 8, 2024—source ↗
Meta Beaver DamMetaBeaver Dam, WIDodge County—$1BUnder constructionFeb 20252027source ↗
Google Michigan CityGoogleMichigan City, INLaPorte County—$832MUnder constructionJul 2025—source ↗
Meta JeffersonvilleMetaJeffersonville, INClark County—$800MUnder constructionJan 25, 2024—source ↗
Meta Bowling GreenMetaBowling Green, OHWood County—$800MUnder construction——source ↗
Meta AikenMetaAiken, SCAiken County—$800MUnder constructionAug 29, 2024—source ↗
Meta CheyenneMetaCheyenne, WYLaramie County—$800MUnder constructionNov 7, 2023—source ↗
Google OmahaGoogleOmaha, NEDouglas County—$750MOperating2022—source ↗
Google LincolnGoogleLincoln, NELancaster County—$600MPlanned——source ↗
Google PapillionGooglePapillion, NESarpy County—$600MOperating2019—source ↗
Google Montgomery CountyGoogleMontgomery County, TNMontgomery County—$600MOperating20152019source ↗
Google Cedar RapidsGoogleCedar Rapids, IALinn County—$576MPlannedFeb 2024—source ↗
Google Douglas CountyGoogleDouglas County, GADouglas County——Operating——source ↗
Google HermantownGoogleHermantown, MNSt. Louis County——Planned——source ↗
Google Pine IslandGooglePine Island, MNGoodhue County——PlannedOct 7, 2025—source ↗
Google Muskogee CountyGoogleMuskogee County, OKMuskogee County——Under construction2025—source ↗
Google StillwaterGoogleStillwater, OKPayne County——Planned2025—source ↗
Google Dorchester CountyGoogleDorchester County, SCDorchester County——Under constructionSep 26, 2024—source ↗
Google Armstrong CountyGoogleArmstrong County, TXArmstrong County——Planned2025—source ↗
Google Haskell CountyGoogleHaskell County, TXHaskell County——Planned2025—source ↗
Google Pampa (Meitner Energy Center)GooglePampa, TXGray County——Under construction2026—source ↗
Google Red OakGoogleRed Oak, TXEllis County——OperatingAug 31, 2023—source ↗
Google Wilbarger CountyGoogleWilbarger County, TXWilbarger County——PlannedFeb 24, 2026—source ↗
Google Chesterfield CountyGoogleChesterfield County, VAChesterfield County——PlannedAug 27, 2025—source ↗
Google Northern VirginiaGoogleNorthern Virginia, VAFairfax County——OperatingNov 29, 2017—source ↗
Microsoft Kenosha (I-94 / Highway 142)MicrosoftKenosha, WIKenosha County——PlannedJan 27, 2025—source ↗
Microsoft Fairwater AtlantaMicrosoftFayetteville, GAFayette County——OperatingAug 20222025source ↗
Equinix NY6 SecaucusEquinixSecaucus, NJHudson County——Operating—2015source ↗
Equinix LA1 Los AngelesEquinixLos Angeles, CALos Angeles County——Operating——source ↗
Stargate Lordstown (SoftBank / Foxconn)SoftBank / OpenAI / FoxconnLordstown, OHTrumbull County——PlannedSep 23, 20252026source ↗
CoreWeave Denton (Core Scientific)CoreWeave / Core ScientificDenton, TXDenton County——Operating—2025source ↗

What this map covers

There is no federal registry of data centers, so this layer is curated by hand from operator announcements, utility and permitting filings, and trade reporting, with the source linked on each row. It covers hyperscale campuses, AI training sites and the major colocation portfolios. It does not yet list every smaller colocation or enterprise facility. Coordinates are the exact site where it is public and the city or county centroid where it is not. The methodology has the full definitions, and you can suggest a project we are missing.