All 156 tracked data centers
Ranked by disclosed power. Power is shown for 112 of 156 campuses; a tilde marks an estimate, and a dash means the operator has not published a figure.
| Campus | Operator | Location | County | Power | Investment | Status | Announced | Year | Source |
|---|---|---|---|---|---|---|---|---|---|
| Fermi America Project Matador | Fermi America | Carson County, TX | Carson County | 11,000 MW | — | Announced | Jun 26, 2025 | 2027 | source ↗ |
| Meta Richland Parish (Hyperion) | Meta | Richland Parish, LA | Richland Parish | 5,000 MW | $50B | Under construction | Dec 4, 2024 | 2030 | source ↗ |
| AWS Northern Indiana / Hobart Campuses | Amazon Web Services | Northern Indiana / Hobart, IN | Lake County | 2,400 MW | — | Planned | Nov 24, 2025 | — | source ↗ |
| AWS Project Rainier (New Carlisle) | Amazon Web Services | New Carlisle, IN | St. Joseph County | 2,200 MW | $11B | Operating | Apr 25, 2024 | 2025 | source ↗ |
| Stargate Doña Ana County (Project Jupiter) | OpenAI / Oracle / STACK | Doña Ana County, NM | Doña Ana County | 2,200 MW | — | Under construction | Sep 23, 2025 | 2028 | source ↗ |
| Stargate Shackelford County (Vantage Frontier) | Vantage / Oracle / OpenAI | Shackelford County, TX | Shackelford County | 1,400 MW | $25B | Under construction | Jul 24, 2025 | 2026 | source ↗ |
| IREN Sweetwater 1 | IREN | Sweetwater, TX | Fisher County | 1,400 MW | — | Under construction | — | 2027 | source ↗ |
| Stargate Saline Township (Related Digital) | Related Digital / Oracle / OpenAI | Saline Township, MI | Washtenaw County | ~1,400 MW | — | Under construction | Oct 30, 2025 | 2028 | source ↗ |
| Nscale Monarch AI Campus | Nscale / Microsoft | Mason County, WV | Mason County | 1,350 MW | — | Planned | Aug 16, 2023 | 2027 | source ↗ |
| Stargate Port Washington (Vantage Lighthouse) | Vantage / Oracle / OpenAI | Port Washington, WI | Ozaukee County | ~1,300 MW | $15B | Under construction | Jun 11, 2025 | 2028 | source ↗ |
| Google New Florence | New Florence, MO | Montgomery County | 1,200 MW | $15B | Planned | May 20, 2026 | 2028 | source ↗ | |
| Stargate Abilene | Oracle / Crusoe / OpenAI | Abilene, TX | Taylor County | 1,200 MW | — | Operating | Jul 18, 2024 | 2025 | source ↗ |
| Stargate Milam County | OpenAI / SB Energy | Milam County, TX | Milam County | ~1,200 MW | — | Under construction | Sep 23, 2025 | 2028 | source ↗ |
| xAI Colossus 2 | xAI | Southaven, MS | DeSoto County | ~1,000 MW | $20B | Operating | Mar 7, 2025 | 2025 | source ↗ |
| Meta El Paso | Meta | El Paso, TX | El Paso County | 1,000 MW | $14B | Under construction | Dec 4, 2023 | 2028 | source ↗ |
| Meta Lebanon | Meta | Lebanon, IN | Boone County | 1,000 MW | $10B | Under construction | Nov 25, 2024 | — | source ↗ |
| Meta Prometheus | Meta | New Albany, OH | Franklin County | 1,000 MW | — | Operating | Aug 15, 2017 | 2025 | source ↗ |
| Meta Eagle Mountain | Meta | Eagle Mountain, UT | Utah County | 970 MW | — | Operating | May 30, 2018 | 2018 | source ↗ |
| CleanArc VA1 | CleanArc | Caroline County, VA | Caroline County | 900 MW | — | Under construction | Nov 21, 2024 | 2028 | source ↗ |
| xAI Colossus 3 | xAI | Memphis, TN | Shelby County | 850 MW | — | Planned | Dec 30, 2025 | 2027 | source ↗ |
| AWS US-East-1 (Ashburn cluster) | Amazon Web Services | Ashburn, VA | Loudoun County | 800 MW | — | Operating | — | 2006 | source ↗ |
| Meta Henrico | Meta | Sandston, VA | Henrico County | ~800 MW | — | Operating | Oct 5, 2017 | 2020 | source ↗ |
| Meta Rosemount | Meta | Rosemount, MN | Dakota County | 750 MW | — | Under construction | Mar 14, 2024 | 2026 | source ↗ |
| Microsoft Fairwater (Mount Pleasant) | Microsoft | Mount Pleasant, WI | Racine County | 750 MW | — | Operating | — | 2026 | source ↗ |
| Switch Citadel | Switch | Tahoe Reno, NV | Storey County | 650 MW | — | Operating | Jan 15, 2015 | 2018 | source ↗ |
| Microsoft Boydton | Microsoft | Boydton, VA | Mecklenburg County | 600 MW | — | Operating | Aug 27, 2010 | 2010 | source ↗ |
| Google Council Bluffs | Council Bluffs, IA | Pottawattamie County | 600 MW | — | Operating | Jun 19, 2007 | 2009 | source ↗ | |
| Penzance Bedington Campus | Penzance Management | Berkeley County, WV | Berkeley County | 600 MW | — | Planned | Feb 26, 2026 | — | source ↗ |
| Google Mesa | Mesa, AZ | Maricopa County | ~600 MW | — | Operating | Jul 1, 2019 | 2025 | source ↗ | |
| Microsoft West Des Moines | Microsoft | West Des Moines, IA | Polk County | 600 MW | — | Operating | Aug 21, 2008 | 2014 | source ↗ |
| Aligned Project Caprock | Aligned Data Centers | Hale County, TX | Hale County | 540 MW | — | Under construction | Feb 27, 2026 | 2027 | source ↗ |
| Google Kansas City Northland Campus (Project Mica, Rocky Branch Creek) | Kansas City, MO | Clay County | 500 MW | $10B | Under construction | Apr 26, 2022 | 2027 | source ↗ | |
| Meta Prineville | Meta | Prineville, OR | Crook County | 500 MW | — | Operating | Jan 21, 2010 | 2011 | source ↗ |
| Meta Kuna | Meta | Kuna, ID | Ada County | ~500 MW | — | Operating | Feb 16, 2022 | 2026 | source ↗ |
| Meta DeKalb | Meta | DeKalb, IL | DeKalb County | 500 MW | — | Operating | Jun 30, 2020 | 2023 | source ↗ |
| AWS Manassas | Amazon Web Services | Manassas, VA | Manassas city | 500 MW | — | Operating | — | 2014 | source ↗ |
| AWS Madison County MS | Amazon Web Services | Madison County, MS | Madison County | 500 MW | — | Planned | Jan 25, 2024 | 2027 | source ↗ |
| Google Columbus | Columbus, OH | Franklin County | ~500 MW | — | Operating | Mar 2021 | 2024 | source ↗ | |
| Meta Kansas City | Meta | Kansas City, MO | Platte County | ~500 MW | — | Operating | Mar 11, 2022 | 2025 | source ↗ |
| Microsoft Goodyear | Microsoft | Goodyear, AZ | Maricopa County | 480 MW | — | Operating | Apr 2019 | 2022 | source ↗ |
| Microsoft Quincy | Microsoft | Quincy, WA | Grant County | 470 MW | — | Operating | Jan 15, 2006 | 2007 | source ↗ |
| Meta Sarpy County | Meta | Papillion, NE | Sarpy County | 450 MW | — | Operating | Apr 6, 2017 | 2020 | source ↗ |
| AWS Hilliard | Amazon Web Services | Hilliard, OH | Franklin County | 400 MW | — | Operating | Sep 2014 | 2016 | source ↗ |
| Google Storey County | Storey County, NV | Storey County | 400 MW | — | Operating | Apr 17, 2017 | 2021 | source ↗ | |
| Microsoft San Antonio | Microsoft | San Antonio, TX | Bexar County | 400 MW | — | Operating | Jan 19, 2007 | 2008 | source ↗ |
| Meta Temple | Meta | Temple, TX | Bell County | 400 MW | — | Operating | Mar 31, 2022 | 2022 | source ↗ |
| Meta Gallatin | Meta | Gallatin, TN | Sumner County | ~400 MW | — | Operating | Aug 12, 2020 | 2024 | source ↗ |
| Meta Los Lunas | Meta | Los Lunas, NM | Valencia County | 400 MW | — | Operating | Jul 9, 2016 | 2019 | source ↗ |
| Apple Waukee | Apple | Waukee, IA | Dallas County | ~400 MW | — | Operating | Aug 24, 2017 | 2024 | source ↗ |
| Google Midlothian | Midlothian, TX | Ellis County | ~400 MW | — | Operating | Aug 1, 2018 | 2020 | source ↗ | |
| Meta Newton County | Meta | Newton County, GA | Newton County | 400 MW | — | Operating | Mar 7, 2018 | 2018 | source ↗ |
| Applied Digital Polaris Forge 1 | Applied Digital / CoreWeave | Ellendale, ND | Dickey County | 400 MW | — | Operating | — | 2025 | source ↗ |
| Google The Dalles | The Dalles, OR | Wasco County | 350 MW | — | Operating | Feb 18, 2005 | 2006 | source ↗ | |
| Meta Forest City | Meta | Forest City, NC | Rutherford County | 350 MW | — | Operating | Nov 11, 2010 | 2012 | source ↗ |
| Google Henderson | Henderson, NV | Clark County | 350 MW | — | Operating | Nov 15, 2018 | 2020 | source ↗ | |
| Google Pryor | Pryor, OK | Mayes County | 350 MW | — | Operating | May 2007 | 2011 | source ↗ | |
| Microsoft El Mirage | Microsoft | El Mirage, AZ | Maricopa County | 350 MW | — | Operating | May 2, 2019 | 2023 | source ↗ |
| xAI Colossus 1 | xAI | Memphis, TN | Shelby County | ~340 MW | — | Operating | Jun 5, 2024 | 2024 | source ↗ |
| CoreWeave Lancaster | CoreWeave | Lancaster County, PA | Lancaster County | 300 MW | $6B | Planned | Jul 16, 2025 | — | source ↗ |
| AWS Hermiston | Amazon Web Services | Hermiston, OR | Umatilla County | 300 MW | — | Operating | Mar 19, 2017 | 2018 | source ↗ |
| Nebius Vineland | Nebius / DataOne | Vineland, NJ | Cumberland County | 300 MW | — | Under construction | Mar 5, 2025 | 2026 | source ↗ |
| Compass Red Oak | Compass Data Centers | Red Oak, TX | Ellis County | 280 MW | — | Operating | Jan 29, 2020 | 2020 | source ↗ |
| Microsoft Cheyenne (Business Parkway / Bison Business Park) | Microsoft | Cheyenne, WY | Laramie County | 280 MW | — | Operating | Apr 9, 2012 | 2012 | source ↗ |
| QTS Ashburn | QTS / Blackstone | Ashburn, VA | Loudoun County | 250 MW | — | Operating | Oct 25, 2017 | 2017 | source ↗ |
| Google Lenoir | Lenoir, NC | Caldwell County | 250 MW | — | Operating | Jan 19, 2007 | 2008 | source ↗ | |
| CoreWeave Plano | CoreWeave | Plano, TX | Collin County | 250 MW | — | Operating | Jul 26, 2023 | 2024 | source ↗ |
| AWS Boardman | Amazon Web Services | Boardman, OR | Morrow County | 250 MW | — | Operating | Nov 7, 2008 | 2014 | source ↗ |
| Google Bridgeport | Bridgeport, AL | Jackson County | 250 MW | — | Operating | Jun 24, 2015 | 2023 | source ↗ | |
| Tract Reno Campus | Tract | Reno, NV | Washoe County | 250 MW | — | Planned | Oct 3, 2023 | 2027 | source ↗ |
| Stack Infrastructure Manassas | Stack Infrastructure | Manassas, VA | Manassas city | 220 MW | — | Operating | Jan 22, 2020 | 2022 | source ↗ |
| Google Moncks Corner | Moncks Corner, SC | Berkeley County | 200 MW | — | Operating | Apr 4, 2007 | 2013 | source ↗ | |
| Apple Prineville | Apple | Prineville, OR | Crook County | 200 MW | — | Operating | Dec 2011 | 2014 | source ↗ |
| Apple Reno | Apple | Reno, NV | Washoe County | 175 MW | — | Operating | Jun 26, 2012 | 2013 | source ↗ |
| Iron Mountain VA-1 Manassas | Iron Mountain | Manassas, VA | Manassas city | 142 MW | — | Operating | Mar 9, 2016 | 2017 | source ↗ |
| Aligned West Jordan | Aligned Data Centers | West Jordan, UT | Salt Lake County | 120 MW | — | Operating | Mar 22, 2018 | 2021 | source ↗ |
| Apple Maiden | Apple | Maiden, NC | Catawba County | 100 MW | — | Operating | Jun 3, 2009 | 2011 | source ↗ |
| Google LaGrange | LaGrange, GA | Troup County | 100 MW | — | Planned | Apr 21, 2026 | — | source ↗ | |
| Apple Mesa | Apple | Mesa, AZ | Maricopa County | 100 MW | — | Operating | Feb 2, 2015 | 2017 | source ↗ |
| Digital Realty Lakeside (350 E Cermak) | Digital Realty | Chicago, IL | Cook County | 100 MW | — | Operating | — | 1999 | source ↗ |
| Digital Realty Manassas | Digital Realty | Manassas, VA | Manassas city | 90 MW | — | Operating | Jul 26, 2018 | 2018 | source ↗ |
| CyrusOne Sterling | CyrusOne | Sterling, VA | Loudoun County | 90 MW | — | Operating | — | 2017 | source ↗ |
| Digital Realty Garland | Digital Realty | Garland, TX | Dallas County | 80 MW | — | Operating | Aug 25, 2017 | 2019 | source ↗ |
| CyrusOne Phoenix | CyrusOne | Chandler, AZ | Maricopa County | 80 MW | — | Operating | Sep 2011 | 2016 | source ↗ |
| NTT RagingWire Sacramento | NTT Global Data Centers | Sacramento, CA | Sacramento County | 80 MW | — | Operating | — | 2017 | source ↗ |
| Stack Infrastructure San Jose | Stack Infrastructure | San Jose, CA | Santa Clara County | 80 MW | — | Operating | Jan 16, 2020 | 2021 | source ↗ |
| CyrusOne San Antonio | CyrusOne | San Antonio, TX | Bexar County | 70 MW | — | Operating | Dec 23, 2011 | 2014 | source ↗ |
| Digital Realty Northlake | Digital Realty | Northlake, IL | Cook County | 65 MW | — | Operating | Oct 24, 2017 | 2017 | source ↗ |
| NTT Garland | NTT Global Data Centers | Garland, TX | Dallas County | 65 MW | — | Operating | Aug 20, 2015 | 2018 | source ↗ |
| Vantage Quincy | Vantage Data Centers | Quincy, WA | Grant County | 60 MW | — | Operating | Sep 27, 2011 | 2019 | source ↗ |
| CyrusOne Aurora (CHI1, former CME data center) | CyrusOne | Aurora, IL | DuPage County | 60 MW | — | Operating | — | 2009 | source ↗ |
| Digital Realty Piscataway Campus (3 Corporate Place / 365 S Randolphville Rd) | Digital Realty | Piscataway, NJ | Middlesex County | 55 MW | — | Operating | — | — | source ↗ |
| Lambda Allen | Lambda Labs | Allen, TX | Collin County | 50 MW | — | Operating | — | 2024 | source ↗ |
| Microsoft Alviso / San Jose | Microsoft | San Jose, CA | Santa Clara County | 48 MW | — | Under construction | Sep 29, 2017 | 2028 | source ↗ |
| STACK Infrastructure ATL02 (Lithia Springs) | Stack Infrastructure | Lithia Springs, GA | Douglas County | 48 MW | — | Under construction | Oct 16, 2023 | 2027 | source ↗ |
| Equinix DA11 Dallas | Equinix | Dallas, TX | Dallas County | 42 MW | — | Operating | Feb 21, 2019 | 2020 | source ↗ |
| Equinix CH4 Chicago | Equinix | Chicago, IL | Cook County | 40 MW | — | Operating | Jul 15, 2009 | 2017 | source ↗ |
| DataBank ATL2 | DataBank | Atlanta, GA | Fulton County | 40 MW | — | Operating | — | — | source ↗ |
| Equinix SV10 Silicon Valley | Equinix | San Jose, CA | Santa Clara County | 36 MW | — | Operating | Jun 14, 2016 | 2019 | source ↗ |
| Equinix DC12 Ashburn | Equinix | Ashburn, VA | Loudoun County | 30 MW | — | Operating | Aug 3, 2016 | 2018 | source ↗ |
| Equinix DC10 Ashburn | Equinix | Ashburn, VA | Loudoun County | 30 MW | — | Operating | Jul 27, 2011 | 2016 | source ↗ |
| Digital Realty Westin Seattle | Digital Realty | Seattle, WA | King County | 30 MW | — | Operating | — | 1997 | source ↗ |
| DataBank SLC1 | DataBank | Salt Lake City, UT | Salt Lake County | 30 MW | — | Operating | Jan 17, 2017 | 2017 | source ↗ |
| Equinix DC1 Ashburn | Equinix | Ashburn, VA | Loudoun County | 28 MW | — | Operating | — | 2000 | source ↗ |
| Equinix CH3 Chicago | Equinix | Elk Grove Village, IL | Cook County | 28 MW | — | Operating | — | 2014 | source ↗ |
| CoreSite SV4 Santa Clara | CoreSite | Santa Clara, CA | Santa Clara County | 24 MW | — | Operating | — | 2013 | source ↗ |
| Cologix COL1 Columbus | Cologix | Columbus, OH | Franklin County | 22 MW | — | Operating | Feb 4, 2014 | 2018 | source ↗ |
| Equinix AT1 Atlanta | Equinix | Atlanta, GA | Fulton County | 20 MW | — | Operating | — | 2010 | source ↗ |
| Equinix SV1 San Jose | Equinix | San Jose, CA | Santa Clara County | 18 MW | — | Operating | — | 2001 | source ↗ |
| CoreSite VA1 Reston | CoreSite | Reston, VA | Fairfax County | 18 MW | — | Operating | — | 2010 | source ↗ |
| Equinix MI1 Miami (NAP of the Americas) | Equinix | Miami, FL | Miami-Dade County | 17 MW | — | Operating | — | 2001 | source ↗ |
| CoreSite NY1 New York | CoreSite | New York, NY | New York County | 14 MW | — | Operating | — | 2008 | source ↗ |
| DataBank SAN1 | DataBank | San Diego, CA | San Diego County | 7 MW | — | Operating | — | — | source ↗ |
| AWS Salem Township (Susquehanna) | Amazon Web Services | Salem Township, PA | Luzerne County | — | $20B | Planned | Mar 4, 2024 | — | source ↗ |
| AWS Northwest Louisiana Campuses | Amazon Web Services / STACK | Caddo and Bossier Parishes, LA | Caddo Parish | — | $18B | Planned | Feb 23, 2026 | — | source ↗ |
| AWS Georgia (Butts / Douglas Counties) | Amazon Web Services | Butts County, GA | Butts County | — | $11B | Planned | Jan 7, 2025 | — | source ↗ |
| AWS Montgomery County Missouri Campus | Amazon Web Services | Montgomery County, MO | Montgomery County | — | $10B | Planned | — | — | source ↗ |
| AWS Richmond County (Energy Way) | Amazon Web Services | Hamlet, NC | Richmond County | — | $10B | Under construction | Jun 4, 2025 | — | source ↗ |
| Google West Memphis | West Memphis, AR | Crittenden County | — | $4B | Planned | Oct 2, 2025 | 2027 | source ↗ | |
| Meta Altoona | Meta | Altoona, IA | Polk County | — | $2.5B | Operating | Jun 25, 2012 | — | source ↗ |
| Google Fort Wayne | Fort Wayne, IN | Allen County | — | $2B | Operating | Oct 9, 2023 | 2025 | source ↗ | |
| Meta Huntsville | Meta | Huntsville, AL | Madison County | — | $1.5B | Operating | Jun 14, 2018 | — | source ↗ |
| Meta Montgomery | Meta | Montgomery, AL | Montgomery County | — | $1.5B | Under construction | May 2, 2024 | — | source ↗ |
| Meta Fort Worth | Meta | Fort Worth, TX | Tarrant County | — | $1.5B | Operating | May 22, 2015 | — | source ↗ |
| Meta Mesa | Meta | Mesa, AZ | Maricopa County | — | $1B | Operating | May 2021 | 2025 | source ↗ |
| Google Kansas City (Project Shale, Hunt Midwest Business Center) | Kansas City, MO | Clay County | — | $1B | Under construction | Mar 20, 2024 | — | source ↗ | |
| Meta Tulsa | Meta | Tulsa, OK | Tulsa County | — | $1B | Under construction | Mar 8, 2024 | — | source ↗ |
| Meta Beaver Dam | Meta | Beaver Dam, WI | Dodge County | — | $1B | Under construction | Feb 2025 | 2027 | source ↗ |
| Google Michigan City | Michigan City, IN | LaPorte County | — | $832M | Under construction | Jul 2025 | — | source ↗ | |
| Meta Jeffersonville | Meta | Jeffersonville, IN | Clark County | — | $800M | Under construction | Jan 25, 2024 | — | source ↗ |
| Meta Bowling Green | Meta | Bowling Green, OH | Wood County | — | $800M | Under construction | — | — | source ↗ |
| Meta Aiken | Meta | Aiken, SC | Aiken County | — | $800M | Under construction | Aug 29, 2024 | — | source ↗ |
| Meta Cheyenne | Meta | Cheyenne, WY | Laramie County | — | $800M | Under construction | Nov 7, 2023 | — | source ↗ |
| Google Omaha | Omaha, NE | Douglas County | — | $750M | Operating | 2022 | — | source ↗ | |
| Google Lincoln | Lincoln, NE | Lancaster County | — | $600M | Planned | — | — | source ↗ | |
| Google Papillion | Papillion, NE | Sarpy County | — | $600M | Operating | 2019 | — | source ↗ | |
| Google Montgomery County | Montgomery County, TN | Montgomery County | — | $600M | Operating | 2015 | 2019 | source ↗ | |
| Google Cedar Rapids | Cedar Rapids, IA | Linn County | — | $576M | Planned | Feb 2024 | — | source ↗ | |
| Google Douglas County | Douglas County, GA | Douglas County | — | — | Operating | — | — | source ↗ | |
| Google Hermantown | Hermantown, MN | St. Louis County | — | — | Planned | — | — | source ↗ | |
| Google Pine Island | Pine Island, MN | Goodhue County | — | — | Planned | Oct 7, 2025 | — | source ↗ | |
| Google Muskogee County | Muskogee County, OK | Muskogee County | — | — | Under construction | 2025 | — | source ↗ | |
| Google Stillwater | Stillwater, OK | Payne County | — | — | Planned | 2025 | — | source ↗ | |
| Google Dorchester County | Dorchester County, SC | Dorchester County | — | — | Under construction | Sep 26, 2024 | — | source ↗ | |
| Google Armstrong County | Armstrong County, TX | Armstrong County | — | — | Planned | 2025 | — | source ↗ | |
| Google Haskell County | Haskell County, TX | Haskell County | — | — | Planned | 2025 | — | source ↗ | |
| Google Pampa (Meitner Energy Center) | Pampa, TX | Gray County | — | — | Under construction | 2026 | — | source ↗ | |
| Google Red Oak | Red Oak, TX | Ellis County | — | — | Operating | Aug 31, 2023 | — | source ↗ | |
| Google Wilbarger County | Wilbarger County, TX | Wilbarger County | — | — | Planned | Feb 24, 2026 | — | source ↗ | |
| Google Chesterfield County | Chesterfield County, VA | Chesterfield County | — | — | Planned | Aug 27, 2025 | — | source ↗ | |
| Google Northern Virginia | Northern Virginia, VA | Fairfax County | — | — | Operating | Nov 29, 2017 | — | source ↗ | |
| Microsoft Kenosha (I-94 / Highway 142) | Microsoft | Kenosha, WI | Kenosha County | — | — | Planned | Jan 27, 2025 | — | source ↗ |
| Microsoft Fairwater Atlanta | Microsoft | Fayetteville, GA | Fayette County | — | — | Operating | Aug 2022 | 2025 | source ↗ |
| Equinix NY6 Secaucus | Equinix | Secaucus, NJ | Hudson County | — | — | Operating | — | 2015 | source ↗ |
| Equinix LA1 Los Angeles | Equinix | Los Angeles, CA | Los Angeles County | — | — | Operating | — | — | source ↗ |
| Stargate Lordstown (SoftBank / Foxconn) | SoftBank / OpenAI / Foxconn | Lordstown, OH | Trumbull County | — | — | Planned | Sep 23, 2025 | 2026 | source ↗ |
| CoreWeave Denton (Core Scientific) | CoreWeave / Core Scientific | Denton, TX | Denton County | — | — | Operating | — | 2025 | source ↗ |
What this map covers
There is no federal registry of data centers, so this layer is curated by hand from operator announcements, utility and permitting filings, and trade reporting, with the source linked on each row. It covers hyperscale campuses, AI training sites and the major colocation portfolios. It does not yet list every smaller colocation or enterprise facility. Coordinates are the exact site where it is public and the city or county centroid where it is not. The methodology has the full definitions, and you can suggest a project we are missing.
Tracking the storage side of the same buildout? See the battery storage (BESS) database.