State profile
Data centers & battery storage in Texas
407 tracked projects · 52,017 MW · 16 data centers, 391 battery (BESS) sites
Below is every data center and battery energy storage (BESS) project we track in Texas, ranked by capacity. Battery projects are sourced from the federal EIA-860M inventory; data centers are hand-curated with a public source on each entry. See the methodology for details.
All Texas projects
| Project | Operator | Type | Location | Capacity | Status | Year | Source |
|---|---|---|---|---|---|---|---|
| Vantage Frontier | Vantage Data Centers | Data center | Shackelford County | 1,400 MW | Planned | 2027 | source ↗ |
| Sweetwater 1 | Lancium / Crusoe | Data center | Sweetwater | 1,400 MW | Under construction | 2026 | source ↗ |
| Stargate (Oracle / Crusoe) | Oracle / Crusoe / OpenAI | Data center | Abilene | 1,200 MW | Under construction | 2026 | source ↗ |
| Lunis Creek BESS | Engie | BESS | Falls County | 621 MW | Under construction | 2026 | source ↗ |
| Clear Fork Creek Solar + BESS | Engie | BESS | Throckmorton County | 600 MW | Under construction | 2026 | source ↗ |
| Aligned Project Caprock | Aligned Data Centers | Data center | Hale County | 540 MW | Under construction | 2027 | source ↗ |
| Hecate Energy Ramsey Storage | Hecate Energy Ramsey Storage, LLC | BESS | Wharton | 500 MW | Planned | 2027 | source ↗ |
| Sunscape Renewable Energy | Vesper Energy Development LLC | BESS | Nueces | 500 MW | Planned | 2028 | source ↗ |
| La Salle ESS | La Salle ESS LLC | BESS | LaSalle | 500 MW | Planned | 2027 | source ↗ |
| Hollow Branch Creek 2 Solar and BESS SLF | Solar Proponent LLC | BESS | Madison | 460 MW | Planned | 2027 | source ↗ |
| Tehuacana Creek 1 Solar + BESS | Recurrent Energy | BESS | Limestone County | 418 MW | Under construction | 2026 | source ↗ |
| SAHARA BESS (SOHO BESS) | ESTX-PLD-HOUSTON2, LLC | BESS | Brazoria | 409 MW | Under construction | 2026 | source ↗ |
| Microsoft San Antonio | Microsoft | Data center | San Antonio | 400 MW | Operating | 2008 | source ↗ |
| Meta Temple | Meta | Data center | Temple | 400 MW | Operating | 2022 | source ↗ |
| Google Midlothian | Data center | Midlothian | 400 MW | Under construction | 2026 | source ↗ | |
| Iron Belt | Iron Belt Energy Storage Project, LLC | BESS | Borden | 400 MW | Planned | 2027 | source ↗ |
| AWS Pflugerville | Amazon Web Services | Data center | Pflugerville | 350 MW | Operating | 2022 | source ↗ |
| Rowdy Creek Solar and BESS | Solar Proponent LLC | BESS | Lamar | 350 MW | Planned | 2027 | source ↗ |
| Platinum Storage | Platinum Energy Storage LLC | BESS | Fannin | 348 MW | Under construction | 2026 | source ↗ |
| Quantum BESS | IP Quantum BESS, LLC | BESS | Haskell | 321 MW | Under construction | 2026 | source ↗ |
| Quantum II BESS | IP Quantum II BESS, LLC | BESS | Haskell | 321 MW | Under construction | 2026 | source ↗ |
| Cuchillas PV and BESS | Gransolar Texas Two LLC | BESS | Webb | 307 MW | Planned | 2028 | source ↗ |
| Ash Creek BESS | ACTX BESS Project LLC | BESS | Hill | 306 MW | Planned | 2028 | source ↗ |
| SMT Ironman Battery Storage Plant | SMT Ironman BESS LLC | BESS | Brazoria | 304 MW | Operating | 2025 | source ↗ |
| Middlebrook Creek Solar and BESS | Solar Proponent LLC | BESS | Nacogdoches | 303 MW | Planned | 2027 | source ↗ |
| Rodeo Ranch Energy Storage | Plus Power | BESS | Pecos | 300 MW | Operating | 2023 | source ↗ |
| Revolution BESS | Spearmint Energy | BESS | Borden County | 300 MW | Operating | 2024 | source ↗ |
| GulfStar Power, LLC | GulfStar Power, LLC | BESS | Wharton | 300 MW | Operating | 2025 | source ↗ |
| PP Jaguar BESS LLC | PP Jaguar BESS LLC | BESS | McLennan | 300 MW | Operating | 2025 | source ↗ |
| Elio Energy LLC | Elio Energy LLC | BESS | Brazoria | 300 MW | Planned | 2027 | source ↗ |
| Red Hollow Renewable Energy | Vesper Energy Development LLC | BESS | Archer | 300 MW | Planned | 2027 | source ↗ |
| Sunrose Renewable Energy | Vesper Energy Development LLC | BESS | Austin | 300 MW | Planned | 2027 | source ↗ |
| Cartwheel 1 - Storage, LLC | RWE Clean Energy | BESS | Hopkins | 300 MW | Under construction | 2026 | source ↗ |
| Red Egret | Red Egret, LLC | BESS | Galveston | 300 MW | Under construction | 2027 | source ↗ |
| Tanzanite Storage | Tanzanite Energy Storage LLC | BESS | Henderson | 283 MW | Operating | 2025 | source ↗ |
| Compass Red Oak | Compass Data Centers | Data center | Red Oak | 280 MW | Operating | 2020 | source ↗ |
| DeCordova Steam Electric Station | Luminant Generation Company LLC | BESS | Hood | 269 MW | Operating | 2022 | source ↗ |
| Five Wells Solar Center - Hybrid | Five Wells Solar Center, LLC | BESS | Bell | 262 MW | Operating | 2024 | source ↗ |
| Hecate Grid East Valley Storage | Hecate Grid East Valley Storage, LLC | BESS | Cameron | 255 MW | Planned | 2027 | source ↗ |
| CoreWeave Plano | CoreWeave | Data center | Plano | 250 MW | Operating | 2024 | source ↗ |
| Zeya | Engie North America | BESS | Galveston | 250 MW | Under construction | 2026 | source ↗ |
| Mystic Springs Renewable Energy (Hybrid) | Vesper Energy Development LLC | BESS | Kaufman | 250 MW | Planned | 2026 | source ↗ |
| Lazy U ESS 1 | Lazy U ESS 1 LLC | BESS | Hardeman | 250 MW | Planned | 2027 | source ↗ |
| Lazy U ESS 2 | Lazy U ESS 2 LLC | BESS | Hardeman | 250 MW | Planned | 2029 | source ↗ |
| Old 300 Storage Center | Old 300 Storage Center, LLC | BESS | Fort Bend | 250 MW | Under construction | 2026 | source ↗ |
| Rock N' Roll | Lydian Energy | BESS | Brazoria | 250 MW | Planned | 2027 | source ↗ |
| Anole Energy Storage | Anole Energy Storage, LLC | BESS | Dallas | 240 MW | Operating | 2025 | source ↗ |
| Libra Storage | Libra Storage LLC | BESS | Guadalupe | 236 MW | Operating | 2023 | source ↗ |
| Duffy BESS | Duffy Energy Storage LLC | BESS | Matagorda | 236 MW | Planned | 2026 | source ↗ |
| Adelite Storage Project LLC | Acciona Energy USA Global, LLC | BESS | Milam | 230 MW | Planned | 2027 | source ↗ |
| Guajillo Energy Storage | Guajillo Energy Storage, LLC | BESS | Webb | 229 MW | Operating | 2025 | source ↗ |
| Ventures BESS | Gransolar Texas Twelve LLC | BESS | Matagorda | 227 MW | Planned | 2028 | source ↗ |
| Bramble Energy Center | Mission Clean Energy Devco LLC | BESS | Zavala | 225 MW | Planned | 2029 | source ↗ |
| Hidden Lakes Reliability Project | Evelyn Energy Storage LLC | BESS | Galveston | 220 MW | Operating | 2025 | source ↗ |
| Coke BESS | RIC Development, LLC | BESS | Coke | 220 MW | Planned | 2028 | source ↗ |
| Amador BESS | BT Amador Storage LLC | BESS | Van Zandt | 220 MW | Under construction | 2026 | source ↗ |
| Ebony Energy Storage | Ebony Energy Storage, LLC | BESS | Comal | 208 MW | Operating | 2024 | source ↗ |
| Citadel Battery Storage Plant | Citadel BESS LLC | BESS | Harris | 204 MW | Operating | 2024 | source ↗ |
| Crossett Power Management LLC | Crossett Power Management LLC | BESS | Crane | 203 MW | Operating | 2022 | source ↗ |
| Champaign BESS, LLC | Samsung C&T Renewables, LLC | BESS | Glasscock | 203 MW | Planned | 2026 | source ↗ |
| Dios BESS, LLC | Samsung C&T Renewables, LLC | BESS | Jackson | 202 MW | Planned | 2027 | source ↗ |
| Bell Creek BESS LLC | Nexus Renewables U.S. Inc. | BESS | Brazoria | 201 MW | Planned | 2028 | source ↗ |
| Blackcat BESS | RIC Development, LLC | BESS | Matagorda | 201 MW | Planned | 2028 | source ↗ |
| Kahla Storage | Belltown Power Texas 2, LLC | BESS | Leon | 201 MW | Planned | 2027 | source ↗ |
| Resaca Oasis Storage | Red River Clean Energy | BESS | Cameron | 201 MW | Planned | 2027 | source ↗ |
| Hummingbird Energy Storage | Eolian / Mitsubishi | BESS | Llano County | 200 MW | Operating | 2023 | source ↗ |
| Crusoe Anson | Crusoe Energy | Data center | Anson | 200 MW | Operating | 2024 | source ↗ |
| Sun Valley BESS | Engie | BESS | Hill County | 200 MW | Operating | 2024 | source ↗ |
| Buck Branch BESS | Engie | BESS | Brown County | 200 MW | Operating | 2024 | source ↗ |
| Sleepy Hollow BESS | RWE | BESS | Coke County | 200 MW | Operating | 2024 | source ↗ |
| EDP Sonrisa BESS | EDP Renewables | BESS | Bee County | 200 MW | Operating | 2024 | source ↗ |
| Jasper Solar + Storage | Jupiter Power | BESS | Anderson County | 200 MW | Operating | 2024 | source ↗ |
| Callisto BESS | Jupiter Power | BESS | Harris County | 200 MW | Operating | 2023 | source ↗ |
| Cinco BESS | Aypa Power | BESS | Fort Bend County | 200 MW | Operating | 2024 | source ↗ |
| Amelia BESS | Aypa Power | BESS | Brazoria County | 200 MW | Under construction | 2026 | source ↗ |
| Dickens | Engie North America | BESS | Dickens | 200 MW | Operating | 2024 | source ↗ |
| Hydra | Engie North America | BESS | Pecos | 200 MW | Operating | 2024 | source ↗ |
| Paleo | Engie North America | BESS | Hale | 200 MW | Operating | 2024 | source ↗ |
| Cachi | Engie North America | BESS | Guadalupe | 200 MW | Operating | 2025 | source ↗ |
| Tidwell Prairie Storage 1 | Tidwell Prairie | BESS | Robertson | 200 MW | Operating | 2025 | source ↗ |
| Anemoi Energy Storage | Anemoi Energy Storage, LLC | BESS | Hidalgo | 200 MW | Operating | 2024 | source ↗ |
| Pine Forest Solar I | Pine Forest Solar I, LLC | BESS | Hopkins | 200 MW | Operating | 2025 | source ↗ |
| Sealy BESS | Sealy Power, LLC | BESS | Austin | 200 MW | Operating | 2025 | source ↗ |
| Eldora Energy LLC | Eldora Energy LLC | BESS | Matagorda | 200 MW | Planned | 2027 | source ↗ |
| Castor | Engie North America | BESS | Brazoria | 200 MW | Under construction | 2026 | source ↗ |
| Desna | Engie North America | BESS | Brazoria | 200 MW | Under construction | 2026 | source ↗ |
| OCI Hillsboro | HEC Renewable Energy America LLC | BESS | Hill | 200 MW | Planned | 2027 | source ↗ |
| Jones City 2 Solar | Lightsource Renewable Energy Asset Management, LLC | BESS | Jones | 200 MW | Under construction | 2027 | source ↗ |
| Rock Rose Energy Storage LLC | Rock Rose Energy Storage LLC | BESS | Fort Bend | 200 MW | Planned | 2027 | source ↗ |
| Alina Energy LLC | Alina Energy LLC | BESS | Wilson | 200 MW | Planned | 2028 | source ↗ |
| Bhalu | Cypress Creek Renewables | BESS | Howard | 200 MW | Planned | 2027 | source ↗ |
| Destiny Storage | Cypress Creek Renewables | BESS | Harris | 200 MW | Under construction | 2026 | source ↗ |
| Fort Watt Storage | Cypress Creek Renewables | BESS | Tarrant | 200 MW | Planned | 2026 | source ↗ |
| Jerboa Storage | Cypress Creek Renewables | BESS | Hidalgo | 200 MW | Planned | 2026 | source ↗ |
| Malala | Cypress Creek Renewables | BESS | Dallas | 200 MW | Planned | 2028 | source ↗ |
| Wallie Storage | Cypress Creek Renewables | BESS | Howard | 200 MW | Planned | 2026 | source ↗ |
| Bypass BESS | Bypass BESS LLC | BESS | Fort Bend | 200 MW | Under construction | 2026 | source ↗ |
| Cumbia Energy Center | Mission Clean Energy Devco LLC | BESS | Nueces | 200 MW | Planned | 2027 | source ↗ |
| Hornet Solar II (TX) (Hybrid) | Vesper Energy Development LLC | BESS | Swisher | 200 MW | Planned | 2028 | source ↗ |
| Morrow Lake BESS | Leeward Asset Management, LLC | BESS | Frio | 200 MW | Under construction | 2027 | source ↗ |
| Alamo City ESS | Alamo City ESS LLC | BESS | Bexar | 200 MW | Planned | 2027 | source ↗ |
| Avant Prairie ESS | Avant Prairie ESS LLC | BESS | Freestone | 200 MW | Planned | 2027 | source ↗ |
| Bravo ESS | Bravo ESS LLC | BESS | Zapata | 200 MW | Planned | 2027 | source ↗ |
| Prost ESS | Prost ESS LLC | BESS | Austin | 200 MW | Planned | 2027 | source ↗ |
| Rush ESS | Rush ESS LLC | BESS | Bexar | 200 MW | Planned | 2027 | source ↗ |
| Sun Angel ESS | Sun Angel ESS LLC | BESS | Angelina | 200 MW | Planned | 2028 | source ↗ |
| SunShiner ESS | SunShiner ESS LLC | BESS | Zavala | 200 MW | Planned | 2027 | source ↗ |
| Tex-Bar ESS | Tex-Bar ESS LLC | BESS | Madison | 200 MW | Planned | 2027 | source ↗ |
| Tidwell Prairie II | Tidwell Prairie IIA LLC | BESS | Robertson | 200 MW | Under construction | 2026 | source ↗ |
| Mendoza Trail BESS | Lydian Energy | BESS | Crane | 200 MW | Under construction | 2026 | source ↗ |
| Pintail BESS | Lydian Energy | BESS | San Patricio | 200 MW | Under construction | 2026 | source ↗ |
| Pine Forest Solar I | Pine Forest Solar I, LLC | BESS | Hopkins | 200 MW | Under construction | 2027 | source ↗ |
| Padua 3 | Padua 3 | BESS | Bexar | 200 MW | Under construction | 2026 | source ↗ |
| Ferdinand Energy Center | Ferdinand Grid, LLC | BESS | Bexar | 200 MW | Under construction | 2026 | source ↗ |
| Apache Hill Energy Center | Apache Hill Energy Center | BESS | Hood | 200 MW | Under construction | 2026 | source ↗ |
| Vertus Energy Storage Plant | Vertus Energy Storage, LLC | BESS | Galveston | 200 MW | Under construction | 2026 | source ↗ |
| Barton Branch IA | Barton Branch IA LLC | BESS | Robertson | 200 MW | Planned | 2026 | source ↗ |
| Steelhead Energy Storage | GRS BESS Texas Seven, LLC | BESS | Fannin | 194 MW | Planned | 2027 | source ↗ |
| Cunningham Storage | Acciona Energy USA Global, LLC | BESS | Hunt | 190 MW | Operating | 2023 | source ↗ |
| Harryoung PV and BESS | Gransolar Texas Four LLC | BESS | Cameron | 190 MW | Planned | 2028 | source ↗ |
| Zephyr Storage | RIC Development, LLC | BESS | Brown | 186 MW | Planned | 2028 | source ↗ |
| Serrano BESS | RIC Development, LLC | BESS | Maverick | 186 MW | Planned | 2028 | source ↗ |
| Blevins Solar & Storage | Geronimo Power | BESS | Falls | 180 MW | Operating | 2025 | source ↗ |
| Starr Solar Ranch | Lightsource Renewable Energy Asset Management, LLC | BESS | Starr | 180 MW | Planned | 2031 | source ↗ |
| Indigo Solar & Storage | Innovative Solar 245 LLC | BESS | Fisher | 180 MW | Planned | 2026 | source ↗ |
| Brazos River BESS LLC | Nexus Renewables U.S. Inc. | BESS | Brazoria | 180 MW | Planned | 2028 | source ↗ |
| Arroyo Storage | BT Cantwell Solar, LLC | BESS | Cameron | 180 MW | Under construction | 2026 | source ↗ |
| Brotherton Storage | Belltown Power Texas 2, LLC | BESS | Anderson | 176 MW | Planned | 2026 | source ↗ |
| Mcmurtre Storage | Belltown Power Texas 2, LLC | BESS | Hunt | 176 MW | Planned | 2027 | source ↗ |
| Willis Storage | Belltown Power Texas 2, LLC | BESS | Hunt | 176 MW | Planned | 2027 | source ↗ |
| Yooperlite Storage | Belltown Power Texas 2, LLC | BESS | Wise | 176 MW | Planned | 2027 | source ↗ |
| Pavo | Engie North America | BESS | Pecos | 175 MW | Operating | 2024 | source ↗ |
| Longbow BESS, LLC | Longbow BESS, LLC | BESS | Brazoria | 174 MW | Operating | 2024 | source ↗ |
| Coneflower Storage Project LLC | Acciona Energy USA Global, LLC | BESS | Chambers | 171 MW | Planned | 2027 | source ↗ |
| Longhorn Storage | Longhorn Storage LLC | BESS | Eastland | 165 MW | Operating | 2024 | source ↗ |
| Concho Pearl Solar and Storage | Red River Clean Energy | BESS | Concho | 162 MW | Planned | 2027 | source ↗ |
| Lumina II Solar Project | IP Lumina II, LLC | BESS | Scurry | 160 MW | Operating | 2025 | source ↗ |
| Lumina Solar Project | IP Lumina, LLC | BESS | Scurry | 160 MW | Operating | 2025 | source ↗ |
| Avila | Engie North America | BESS | Pecos | 160 MW | Operating | 2025 | source ↗ |
| IP Radian, LLC | IP Radian, LLC | BESS | Brown | 160 MW | Under construction | 2026 | source ↗ |
| Pecan BESS | Gransolar Texas Three, LLC | BESS | Leon | 157 MW | Planned | 2027 | source ↗ |
| Chimney Rock BESS | RIC Development, LLC | BESS | Taylor | 156 MW | Planned | 2028 | source ↗ |
| SOSA Energy Center | Energy Vault | BESS | Madison County | 150 MW | Under construction | 2027 | source ↗ |
| Gunnar Reliability Project | GridStor | BESS | Hidalgo County | 150 MW | Under construction | 2026 | source ↗ |
| Lighthouse BESS | RWE | BESS | Tom Green County | 150 MW | Operating | 2024 | source ↗ |
| Northridge BESS | Spearmint Energy | BESS | Borden County | 150 MW | Under construction | 2026 | source ↗ |
| Solidad BESS | Spearmint Energy | BESS | Pecos County | 150 MW | Operating | 2024 | source ↗ |
| Carina | Engie North America | BESS | Nueces | 150 MW | Operating | 2025 | source ↗ |
| Wolf Tank Storage | Wolf Tank Storage LLC | BESS | Webb | 150 MW | Operating | 2023 | source ↗ |
| Borden County BESS | Borden County Battery Energy Storage System LLC | BESS | Borden | 150 MW | Operating | 2024 | source ↗ |
| Desert Willow Energy Storage | Desert Willow Energy Storage | BESS | Ellis | 150 MW | Operating | 2025 | source ↗ |
| Roadrunner Crossing Energy Storage LLC | Roadrunner Crossing Energy Storage LLC | BESS | Eastland | 150 MW | Operating | 2025 | source ↗ |
| Chillingham Storage | Chillingham Storage LLC | BESS | Bell | 150 MW | Operating | 2025 | source ↗ |
| Bocanova Energy Storage | Bocanova Power LLC | BESS | Brazoria | 150 MW | Operating | 2025 | source ↗ |
| Danish Fields Storage | Danish Fields Storage, LLC | BESS | Wharton | 150 MW | Under construction | 2026 | source ↗ |
| Blue Summit II Storage | Blue Summit II Storage, LLC | BESS | Wilbarger | 150 MW | Under construction | 2026 | source ↗ |
| Crowned Heron 1 - Storage, LLC | RWE Clean Energy | BESS | Fort Bend | 150 MW | Under construction | 2026 | source ↗ |
| Crowned Heron 2 - Storage, LLC | RWE Clean Energy | BESS | Fort Bend | 150 MW | Under construction | 2026 | source ↗ |
| Headcamp BESS | Lydian Energy | BESS | Pecos | 150 MW | Under construction | 2026 | source ↗ |
| Padua 2 | Padua 2 | BESS | Bexar | 150 MW | Under construction | 2026 | source ↗ |
| Wizard Energy Storage | Wizard Energy Storage LLC | BESS | Galveston | 150 MW | Under construction | 2026 | source ↗ |
| Cottonwood Bayou Storage | Cottonwood Bayou Storage, LLC | BESS | Brazoria | 150 MW | Under construction | 2026 | source ↗ |
| Bocanova Energy Storage II | Bocanova Power II LLC | BESS | Brazoria | 150 MW | Under construction | 2026 | source ↗ |
| Chisme Solar and Storage | Red River Clean Energy | BESS | Mills | 146 MW | Planned | 2027 | source ↗ |
| Summerhill BESS | RIC Development, LLC | BESS | Taylor | 143 MW | Planned | 2028 | source ↗ |
| Stonewall BESS | RIC Development, LLC | BESS | Stonewall | 135 MW | Planned | 2029 | source ↗ |
| Dolomite Storage | Belltown Power Texas 2, LLC | BESS | Ellis | 126 MW | Planned | 2027 | source ↗ |
| Noble Solar | BT Noble Solar, LLC | BESS | Denton | 125 MW | Operating | 2022 | source ↗ |
| GFTX BESS | Giga Texas Energy LLC | BESS | Travis | 125 MW | Operating | 2024 | source ↗ |
| Connolly BESS | BT Connolly Storage, LLC | BESS | Wise | 125 MW | Operating | 2024 | source ↗ |
| Octans | Engie North America | BESS | Pecos | 125 MW | Under construction | 2028 | source ↗ |
| Houston County BESS | RIC Development, LLC | BESS | Houston | 125 MW | Planned | 2027 | source ↗ |
| Project Lynx | Project Lynx - Giga Texas Energy | BESS | Nueces | 125 MW | Under construction | 2026 | source ↗ |
| TE Smith Storage | BT Smith Storage LLC | BESS | Rockwall | 125 MW | Under construction | 2026 | source ↗ |
| Lupinus Solar 2, LLC | Sunraycer Assets I LLC | BESS | Franklin | 123 MW | Planned | 2027 | source ↗ |
| Backbone Creek BESS | Backbone BESS LLC | BESS | Burnet | 121 MW | Planned | 2026 | source ↗ |
| Wigeon Whistle Battery Storage Plant | Wigeon Whistle BESS LLC | BESS | Collin | 120 MW | Operating | 2024 | source ↗ |
| Wildcat Ranch Energy Storage | Wildcat Ranch Energy Storage, LLC | BESS | Cochran | 120 MW | Planned | 2027 | source ↗ |
| Marcos PV and BESS | GRS BESS Texas Eight LLC | BESS | Victoria | 116 MW | Planned | 2029 | source ↗ |
| Hayrick BESS | Gransolar Texas Five LLC | BESS | Coke | 114 MW | Planned | 2028 | source ↗ |
| Bright Arrow Solar, LLC | RWE Clean Energy | BESS | Hopkins | 104 MW | Operating | 2025 | source ↗ |
| St. Gall Energy Storage I | St. Gall Energy Storage I | BESS | Pecos | 103 MW | Operating | 2024 | source ↗ |
| Fort Duncan BESS | Fort Duncan BESS, LLC | BESS | Maverick | 103 MW | Operating | 2025 | source ↗ |
| Evans Creek Energy Storage Project | Evans Creek Energy Storage LLC | BESS | Val Verde | 103 MW | Under construction | 2026 | source ↗ |
| Gatsby Energy Storage Project | Gatsby Energy Storage LLC | BESS | Pecos | 103 MW | Under construction | 2027 | source ↗ |
| SGT Hoskins Solar Project Hybrid | SGT Hoskins Solar Project, LLC | BESS | Lamar | 102 MW | Planned | 2027 | source ↗ |
| Flower Valley II | Flower Valley II | BESS | Reeves | 101 MW | Operating | 2022 | source ↗ |
| Swoose II | Swoose II | BESS | Ward | 101 MW | Operating | 2022 | source ↗ |
| Dolce BESS, LLC | Samsung C&T Renewables, LLC | BESS | Mitchell | 101 MW | Planned | 2028 | source ↗ |
| Sandford Solar and Storage | Belltown Power Texas 2, LLC | BESS | Wise | 101 MW | Planned | 2027 | source ↗ |
| Echols Creek Solar | BT Ferguson Solar, LLC | BESS | Lamar | 101 MW | Planned | 2028 | source ↗ |
| Chisholm Grid Energy Storage System | Chisholm Grid, LLC | BESS | Tarrant | 100 MW | Operating | 2021 | source ↗ |
| Madero Grid | Madero Grid, LLC | BESS | Hidalgo | 100 MW | Operating | 2023 | source ↗ |
| Ignacio Grid Energy Storage System | Ignacio Grid, LLC | BESS | Hidalgo | 100 MW | Operating | 2023 | source ↗ |
| Bat Cave | Engie North America | BESS | Mason | 100 MW | Operating | 2021 | source ↗ |
| North Fork TX | Engie North America | BESS | Williamson | 100 MW | Operating | 2021 | source ↗ |
| TX12 Silicon Hill Storage | Key Capture Energy | BESS | Travis | 100 MW | Operating | 2022 | source ↗ |
| TX15 Limousin Oak Storage | Key Capture Energy | BESS | Grimes | 100 MW | Operating | 2024 | source ↗ |
| Shamrock Wind | Shamrock Wind LLC | BESS | Crockett | 100 MW | Operating | 2025 | source ↗ |
| Estonian Solar Project, LLC | Enel Green Power Estonian Solar Project, LLC | BESS | Delta | 100 MW | Operating | 2025 | source ↗ |
| Ables Springs Solar & Storage | Ables Springs Solar, LLC | BESS | Kaufman | 100 MW | Operating | 2025 | source ↗ |
| Copperhead Solar, LLC | Geronimo Power | BESS | McLennan | 100 MW | Operating | 2024 | source ↗ |
| Al Pastor Battery Storage Plant | Al Pastor BESS LLC | BESS | Dawson | 100 MW | Operating | 2024 | source ↗ |
| Burksol Energy Storage | Burksol, LLC | BESS | Dickens | 100 MW | Operating | 2025 | source ↗ |
| Angelo Storage | Angelo Storage, LLC | BESS | Tom Green | 100 MW | Operating | 2025 | source ↗ |
| Great Kiskadee Storage | Great Kiskadee Storage, LLC | BESS | Hidalgo | 100 MW | Operating | 2025 | source ↗ |
| St Gall Energy Storage II | St Gall Energy Storage II LLC | BESS | Pecos | 100 MW | Operating | 2025 | source ↗ |
| Citrus Flatts Energy Center, LLC | East Point Energy, LLC | BESS | Cameron | 100 MW | Operating | 2023 | source ↗ |
| TX 14 Venus Mill Storage | Key Capture Energy | BESS | Ellis | 100 MW | Planned | 2028 | source ↗ |
| Yaupon Solar Project (Hybrid) | Yaupon Solar, LLC | BESS | Milam | 100 MW | Planned | 2027 | source ↗ |
| Bexar ESS | Bexar ESS, LLC | BESS | Bexar | 100 MW | Under construction | 2026 | source ↗ |
| Seven Flags BESS LLC | Seven Flags BESS LLC | BESS | Webb | 100 MW | Under construction | 2026 | source ↗ |
| Holly Branch Solar, LLC | Cypress Creek Renewables | BESS | Robertson | 100 MW | Planned | 2027 | source ↗ |
| Jim Wells BESS | RIC Development, LLC | BESS | Jim Hogg | 100 MW | Planned | 2027 | source ↗ |
| Third Coast BESS, LLC | Cypress Creek Renewables | BESS | Jackson | 100 MW | Planned | 2026 | source ↗ |
| Holstein 2 Battery Storage | 229HD 8me, LLC | BESS | Nolan | 100 MW | Planned | 2027 | source ↗ |
| Raven Storage | Raven Storage, LLC | BESS | Wharton | 100 MW | Under construction | 2026 | source ↗ |
| Big Elm Storage | Big Elm Storage, LLC | BESS | Bell | 100 MW | Under construction | 2026 | source ↗ |
| Dahlia Energy | Dahlia Energy LLC | BESS | La Salle | 100 MW | Planned | 2028 | source ↗ |
| Tierra Seca | Tierra Seca BESS, LLC | BESS | Val Verde | 100 MW | Under construction | 2026 | source ↗ |
| Hermes Storage BESS | Bell 1 Storage, LLC | BESS | Bell | 100 MW | Under construction | 2026 | source ↗ |
| Stoneridge Solar, LLC | RWE Clean Energy | BESS | Milam | 100 MW | Under construction | 2026 | source ↗ |
| Pamela Heights I Energy Center | Pamela Heights I Energy Center LLC | BESS | Harris | 100 MW | Planned | 2026 | source ↗ |
| Cannibal Draw Solar and Storage | Red River Clean Energy | BESS | Glasscock | 99 MW | Planned | 2028 | source ↗ |
| Carambola BESS | Carambola BESS LLC | BESS | Hidalgo | 98 MW | Under construction | 2026 | source ↗ |
| Azure Sky Solar | Azure Sky Solar Project, LLC | BESS | Haskell | 91 MW | Operating | 2022 | source ↗ |
| RedSun PV and BESS | Gransolar Texas Twenty Two LLC | BESS | Burnet | 84 MW | Planned | 2027 | source ↗ |
| Lupinus Solar 1, LLC | Sunraycer Assets I LLC | BESS | Franklin | 83 MW | Planned | 2027 | source ↗ |
| Digital Realty Garland | Digital Realty | Data center | Garland | 80 MW | Operating | 2019 | source ↗ |
| Big Star Solar, LLC (Hybrid) | RWE Clean Energy | BESS | Bastrop | 80 MW | Under construction | 2026 | source ↗ |
| Gaia Hybrid | Sunraycer Assets I LLC | BESS | Navarro | 77 MW | Under construction | 2026 | source ↗ |
| Cairos Solar and Storage | Samsung C&T Renewables, LLC | BESS | Kinney | 77 MW | Planned | 2026 | source ↗ |
| Claxton Solar | BT Claxton Solar, LLC | BESS | Hopkins | 76 MW | Planned | 2027 | source ↗ |
| Honeycomb Solar and Storage | Honeycomb Solar Holdco, LLC | BESS | Bee | 76 MW | Under construction | 2026 | source ↗ |
| Dogfish BESS | Dogfish ESS Assets, LLC | BESS | Pecos | 75 MW | Operating | 2025 | source ↗ |
| Noria Hondo Solar (Hybrid) | Nexus Renewable Power, LLC | BESS | Kleberg | 75 MW | Planned | 2027 | source ↗ |
| Ranchland Wind Storage | Ranchland Wind Storage, LLC | BESS | Callahan | 73 MW | Operating | 2024 | source ↗ |
| House Mountain | House Mountain | BESS | Brewster | 73 MW | Operating | 2024 | source ↗ |
| Fence Post Solar Hybrid Project, LLC | Fence Post Solar Project, LLC | BESS | Navarro | 72 MW | Operating | 2024 | source ↗ |
| Stampede Solar Hybrid | Stampede Solar Project LLC | BESS | Hopkins | 72 MW | Operating | 2024 | source ↗ |
| CyrusOne San Antonio | CyrusOne | Data center | San Antonio | 70 MW | Operating | 2014 | source ↗ |
| Antlia | Engie North America | BESS | Val Verde | 70 MW | Operating | 2025 | source ↗ |
| Ganado Solar | Enel Green Power NA, Inc. | BESS | Jackson | 70 MW | Operating | 2024 | source ↗ |
| Briggs Solar, LLC | Briggs Solar, LLC | BESS | Haskell | 70 MW | Planned | 2027 | source ↗ |
| NTT Garland | NTT Global Data Centers | Data center | Garland | 65 MW | Operating | 2018 | source ↗ |
| Liberty Hybrid Solar and Storage Project | Liberty 1 Solar LLC | BESS | Harris | 65 MW | Under construction | 2026 | source ↗ |
| Roadrunner, LLC Hybrid | Roadrunner Solar, LLC | BESS | Upton | 63 MW | Operating | 2023 | source ↗ |
| High Lonesome Wind Power, LLC Hybrid | High Lonesome Wind Power, LLC | BESS | Upton | 63 MW | Operating | 2023 | source ↗ |
| Lower Rio Energy Storage | VESI 38 LLC | BESS | Hidalgo | 60 MW | Operating | 2025 | source ↗ |
| Bird Dog Energy Storage | VESI 37 LLC | BESS | San Patricio | 60 MW | Under construction | 2026 | source ↗ |
| Cross Trails Energy Storage Project | Energy Vault, Inc. | BESS | Scurry | 58 MW | Operating | 2025 | source ↗ |
| Lily Solar Hybrid | Lily Solar, LLC | BESS | Kaufman | 55 MW | Operating | 2021 | source ↗ |
| Eagle Springs Hybrid | Sunraycer Assets I LLC | BESS | Delta | 55 MW | Planned | 2026 | source ↗ |
| Blue Jay Solar I, LLC | Blue Jay Solar I, LLC | BESS | Grimes | 52 MW | Operating | 2023 | source ↗ |
| Roseland Solar Project, LLC | Enel Green Power Roseland Solar, LLC | BESS | Falls | 52 MW | Operating | 2023 | source ↗ |
| Lupinus Storage 3 | Sunraycer Assets I LLC | BESS | Franklin | 51 MW | Planned | 2027 | source ↗ |
| Lambda Allen | Lambda Labs | Data center | Allen | 50 MW | Operating | 2024 | source ↗ |
| Byrd Ranch Storage | Byrd Ranch Storage LLC | BESS | Brazoria | 50 MW | Operating | 2022 | source ↗ |
| Tortolas | Engie North America | BESS | Brazoria | 50 MW | Operating | 2024 | source ↗ |
| TX11 Republic Road Storage | Key Capture Energy | BESS | Robertson | 50 MW | Operating | 2022 | source ↗ |
| TX13 Endurance Park Storage | Key Capture Energy | BESS | Scurry | 50 MW | Operating | 2022 | source ↗ |
| TX19 River Valley Storage 1 | Key Capture Energy | BESS | Williamson | 50 MW | Operating | 2023 | source ↗ |
| TX21 River Valley Storage 2 | Key Capture Energy | BESS | Williamson | 50 MW | Operating | 2023 | source ↗ |
| TX23 Roughneck Storage | Key Capture Energy | BESS | Brazoria | 50 MW | Operating | 2022 | source ↗ |
| Padua 1 | Padua 1 | BESS | Bexar | 50 MW | Operating | 2025 | source ↗ |
| TREX US Red Holly | TREX US Red Holly LLC | BESS | Lynn | 50 MW | Planned | 2027 | source ↗ |
| MRG Goody Solar Project Hybrid | Nexus Renewable Power, LLC | BESS | Lamar | 50 MW | Under construction | 2026 | source ↗ |
| Albatross Solar, LLC | Sunraycer Assets I LLC | BESS | McLennan | 50 MW | Planned | 2027 | source ↗ |
| Midpoint Solar, LLC | Sunraycer Assets I LLC | BESS | Hill | 50 MW | Under construction | 2026 | source ↗ |
| Elm Flats Solar | Birch Creek Development | BESS | Navarro | 50 MW | Under construction | 2026 | source ↗ |
| Findley PV and BESS | Gransolar Texas Sixteen, LLC | BESS | Limestone | 50 MW | Planned | 2028 | source ↗ |
| Stegall Solar and Storage | Belltown Power Texas 2, LLC | BESS | Bell | 50 MW | Planned | 2026 | source ↗ |
| 2W Permian Solar Project Hybrid | 2W Permian Solar, LLC | BESS | Andrews | 40 MW | Operating | 2021 | source ↗ |
| Zier Solar | Cypress Creek Renewables | BESS | Kinney | 40 MW | Operating | 2024 | source ↗ |
| Vernon Solar and Storage | Vernon Solar and Storage, LLC | BESS | Wilbarger | 38 MW | Planned | 2028 | source ↗ |
| Notrees Wind Storage | Duke Energy | BESS | Goldsmith | 36 MW | Operating | 2012 | source ↗ |
| Equinix DA11 Dallas | Equinix | Data center | Dallas | 35 MW | Operating | 2018 | source ↗ |
| Blue Summit Storage, LLC | Blue Summit Storage, LLC | BESS | Wilbarger | 30 MW | Operating | 2017 | source ↗ |
| Second Division Solar | Lightsource Renewable Energy Asset Management, LLC | BESS | Brazoria | 30 MW | Planned | 2031 | source ↗ |
| Upton County BESS | VESI Upton County BESS, LLC | BESS | Upton | 25 MW | Operating | 2023 | source ↗ |
| Pueblo BA | Engie North America | BESS | Maverick | 20 MW | Operating | 2022 | source ↗ |
| Zapata | Engie North America | BESS | Zapata | 20 MW | Operating | 2022 | source ↗ |
| Cameron Wind 1 LLC | Cameron Wind 1 LLC | BESS | Cameron | 16 MW | Operating | 2024 | source ↗ |
| Inertia Energy Storage | Inertia Energy Storage LLC | BESS | Haskell | 13 MW | Operating | 2025 | source ↗ |
| Crosby Clean Energy Center (BESS) | On Energy Storage | BESS | Hsrris | 12 MW | Operating | 2025 | source ↗ |
| Maverick Clean Energy Center (BESS) | On Energy Storage | BESS | Brazoria | 12 MW | Operating | 2025 | source ↗ |
| Pyron Wind Farm LLC Hybrid | RWE Clean Energy | BESS | Fisher | 10 MW | Operating | 2018 | source ↗ |
| Inadale Wind Farm LLC Hybrid | RWE Clean Energy | BESS | Nolan | 10 MW | Operating | 2018 | source ↗ |
| Castle Gap Solar Hybrid | Upton County Solar 2 LLC | BESS | Upton | 10 MW | Operating | 2019 | source ↗ |
| Rabbit Hill Energy Storage Project | Rabbit Hill Energy Storage Project | BESS | Williamson | 10 MW | Operating | 2020 | source ↗ |
| Commerce ESS | City of San Antonio - (TX) | BESS | Bexar | 10 MW | Operating | 2019 | source ↗ |
| Prospect Storage | GlidePath Power Operations LLC | BESS | Brazoria | 10 MW | Operating | 2020 | source ↗ |
| Alvin | Engie North America | BESS | Brazoria | 10 MW | Operating | 2020 | source ↗ |
| Odessa | Engie North America | BESS | Ector | 10 MW | Operating | 2020 | source ↗ |
| Brazoria | Engie North America | BESS | Brazoria | 10 MW | Operating | 2020 | source ↗ |
| Heights | Engie North America | BESS | Galveston | 10 MW | Operating | 2020 | source ↗ |
| Magnolia TX | Engie North America | BESS | Galveston | 10 MW | Operating | 2020 | source ↗ |
| Dickinson | Engie North America | BESS | Galveston | 10 MW | Operating | 2021 | source ↗ |
| Loop 463 | Engie North America | BESS | Victoria | 10 MW | Operating | 2021 | source ↗ |
| Lopeno | Engie North America | BESS | Zapata | 10 MW | Operating | 2022 | source ↗ |
| Ranchtown | Engie North America | BESS | Bexar | 10 MW | Operating | 2021 | source ↗ |
| Sweeny | Engie North America | BESS | Brazoria | 10 MW | Operating | 2021 | source ↗ |
| TX7 Flat Top | Key Capture Energy | BESS | Reeves | 10 MW | Operating | 2020 | source ↗ |
| TX8 Worsham | Key Capture Energy | BESS | Pecos | 10 MW | Operating | 2020 | source ↗ |
| TX2 Port Lavaca | Key Capture Energy | BESS | Calhoun | 10 MW | Operating | 2020 | source ↗ |
| Flower Valley I | Flower Valley | BESS | Reeves | 10 MW | Operating | 2021 | source ↗ |
| Swoose I | Swoose | BESS | Ward | 10 MW | Operating | 2021 | source ↗ |
| Caterina | HEN Infrastructure, L.L.C. | BESS | Dimmit | 10 MW | Operating | 2022 | source ↗ |
| Coyote Springs (TX) | HEN Infrastructure, L.L.C. | BESS | Reeves | 10 MW | Operating | 2022 | source ↗ |
| Farmersville (TX) | HEN Infrastructure, L.L.C. | BESS | Collin | 10 MW | Operating | 2024 | source ↗ |
| Faulkner | HEN Infrastructure, L.L.C. | BESS | Reeves | 10 MW | Operating | 2022 | source ↗ |
| Gomez | HEN Infrastructure, L.L.C. | BESS | Pecos | 10 MW | Operating | 2023 | source ↗ |
| Holcomb (TX) | HEN Infrastructure, L.L.C. | BESS | La Salle | 10 MW | Operating | 2023 | source ↗ |
| Junction (TX) | HEN Infrastructure, L.L.C. | BESS | Kimble | 10 MW | Operating | 2023 | source ↗ |
| Lonestar | HEN Infrastructure, L.L.C. | BESS | Ward | 10 MW | Operating | 2022 | source ↗ |
| Olney | HEN Infrastructure, L.L.C. | BESS | Young | 10 MW | Operating | 2023 | source ↗ |
| Rattlesnake (TX) | HEN Infrastructure, L.L.C. | BESS | Ward | 10 MW | Operating | 2022 | source ↗ |
| Screwbean | HEN Infrastructure, L.L.C. | BESS | Culberson | 10 MW | Operating | 2023 | source ↗ |
| Toyah Power Station | HEN Infrastructure, L.L.C. | BESS | Reeves | 10 MW | Operating | 2021 | source ↗ |
| Val Verde | HEN Infrastructure, L.L.C. | BESS | Hidalgo | 10 MW | Operating | 2024 | source ↗ |
| Hamilton BESS | HEN Infrastructure, L.L.C. | BESS | Val Verde | 10 MW | Operating | 2024 | source ↗ |
| Weil Tract BESS | HEN Infrastructure, L.L.C. | BESS | Nueces | 10 MW | Operating | 2024 | source ↗ |
| Pauline BESS | HEN Infrastructure, L.L.C. | BESS | Henderson | 10 MW | Operating | 2024 | source ↗ |
| Mineral Wells East BESS | HEN Infrastructure, L.L.C. | BESS | Palo Pinto | 10 MW | Operating | 2024 | source ↗ |
| Lufkin South BESS | HEN Infrastructure, L.L.C. | BESS | Angelina | 10 MW | Operating | 2024 | source ↗ |
| Judkins BESS | HEN Infrastructure, L.L.C. | BESS | Ector | 10 MW | Operating | 2024 | source ↗ |
| Garden City East BESS | HEN Infrastructure, L.L.C. | BESS | Glasscock | 10 MW | Operating | 2024 | source ↗ |
| Falfurrias BESS | HEN Infrastructure, L.L.C. | BESS | Brooks | 10 MW | Operating | 2024 | source ↗ |
| Diboll BESS | HEN Infrastructure, L.L.C. | BESS | Angelina | 10 MW | Operating | 2024 | source ↗ |
| CISCO BESS | HEN Infrastructure, L.L.C. | BESS | Eastland | 10 MW | Operating | 2024 | source ↗ |
| SMT Mercedes LLC | SMT Mercedes LLC | BESS | Hidalgo | 10 MW | Operating | 2023 | source ↗ |
| SMT Mission LLC | SMT Mission LLC | BESS | Hidalgo | 10 MW | Operating | 2023 | source ↗ |
| SMT Santa Rosa LLC | SMT Santa Rosa LLC | BESS | Cameron | 10 MW | Operating | 2023 | source ↗ |
| SMT Alamo LLC | SMT Alamo LLC | BESS | Hidalgo | 10 MW | Operating | 2023 | source ↗ |
| SMT Bay City LLC | SMT Bay City LLC | BESS | Matagorda | 10 MW | Operating | 2023 | source ↗ |
| SMT Elsa LLC | SMT Elsa LLC | BESS | Hidalgo | 10 MW | Operating | 2023 | source ↗ |
| SMT Los Fresnos LLC | SMT Los Fresnos LLC | BESS | Cameron | 10 MW | Operating | 2023 | source ↗ |
| SMT Harlingen II LLC | SMT Harlingen II LLC | BESS | Cameron | 10 MW | Operating | 2023 | source ↗ |
| SMT Rio Grande I LLC | SMT Rio Grande I LLC | BESS | Starr | 10 MW | Operating | 2023 | source ↗ |
| SMT Rio Grande II LLC | SMT Rio Grande II LLC | BESS | Starr | 10 MW | Operating | 2023 | source ↗ |
| Pavlov | HEN Infrastructure, L.L.C. | BESS | Matagorda | 10 MW | Operating | 2024 | source ↗ |
| Mainland | HEN Infrastructure, L.L.C. | BESS | Galveston | 10 MW | Operating | 2024 | source ↗ |
| Russek | HEN Infrastructure, L.L.C. | BESS | Reagan | 10 MW | Operating | 2025 | source ↗ |
| Sandlake | HEN Infrastructure, L.L.C. | BESS | Reeves | 10 MW | Operating | 2024 | source ↗ |
| Farmersville West | SBESS TX7 LLC | BESS | Collin | 10 MW | Operating | 2025 | source ↗ |
| Junction BESS | SBESS TX5 LLC | BESS | Kimble | 10 MW | Operating | 2025 | source ↗ |
| Tynan | HEN Infrastructure, L.L.C. | BESS | Bee | 10 MW | Operating | 2025 | source ↗ |
| Century BESS | Prologis Logistics Services Incorporated BESS | BESS | Tarrant | 10 MW | Operating | 2024 | source ↗ |
| Liggett Switch | Prologis Logistics Services Incorporated BESS | BESS | Tarrant | 10 MW | Operating | 2024 | source ↗ |
| Citrus City BESS | Prologis Logistics Services Incorporated BESS | BESS | Hidalgo | 10 MW | Operating | 2025 | source ↗ |
| Rio Grande City BESS 2 | Prologis Logistics Services Incorporated BESS | BESS | Starr | 10 MW | Operating | 2025 | source ↗ |
| Regis Continental | Regis Continental LLC | BESS | Starr | 10 MW | Operating | 2024 | source ↗ |
| Regis Gregory | Regis Gregory LLC | BESS | San Patricio | 10 MW | Operating | 2024 | source ↗ |
| Regis Palacios | Regis Palacios LLC | BESS | Matagorda | 10 MW | Operating | 2024 | source ↗ |
| Regis Carrizo Springs | Regis Carrizo Springs LLC | BESS | Dimmit | 10 MW | Operating | 2025 | source ↗ |
| Regis Goodwin LLC | Regis Goodwin LLC | BESS | Starr | 10 MW | Operating | 2025 | source ↗ |
| Regis Hearn | Regis Hearn LLC | BESS | Nueces | 10 MW | Operating | 2024 | source ↗ |
| Regis Mason | Regis Mason LLC | BESS | Mason | 10 MW | Operating | 2024 | source ↗ |
| Regis Monte Cristo LLC | Regis Monte Cristo LLC | BESS | Hidalgo | 10 MW | Operating | 2024 | source ↗ |
| Regis Muenster | Regis Muenster LLC | BESS | Cooke | 10 MW | Operating | 2024 | source ↗ |
| Regis Pirate | Regis Sinton-Pirate LLC | BESS | San Patricio | 10 MW | Operating | 2024 | source ↗ |
| Regis Falfurrias | Regis Falfurrias LLC | BESS | Brooks | 10 MW | Operating | 2024 | source ↗ |
| Matta Power Station | Matta Power Station LLC | BESS | Reeves | 10 MW | Operating | 2023 | source ↗ |
| Sunset Ridge Energy Center, LLC | East Point Energy, LLC | BESS | Frio | 10 MW | Operating | 2023 | source ↗ |
| SMT Dallas BESS | SMT Dallas LLC | BESS | Dallas | 10 MW | Operating | 2025 | source ↗ |
| SME Mission II BESS | SMT Mission II LLC | BESS | Hidalgo | 10 MW | Operating | 2025 | source ↗ |
| Snyder BESS | Snyder ESS Assets, LLC | BESS | Scurry | 10 MW | Operating | 2021 | source ↗ |
| Sweetwater BESS | Sweetwater ESS Assets, LLC | BESS | Nolan | 10 MW | Operating | 2021 | source ↗ |
| Westover BESS | Westover ESS Assets, LLC | BESS | Ector | 10 MW | Operating | 2021 | source ↗ |
| Grizzly Ridge Solar | Grizzly Ridge Solar LLC | BESS | Hamilton | 10 MW | Under construction | 2026 | source ↗ |
| Cedar Hill ESS | Cedar Hill ESS Assets, LLC | BESS | Dallas | 10 MW | Planned | 2030 | source ↗ |
| Hidden Lakes | SBESS TX6 LLC | BESS | Galveston | 10 MW | Under construction | 2026 | source ↗ |
| Poteet | HEN Infrastructure, L.L.C. | BESS | Atascosa | 10 MW | Under construction | 2026 | source ↗ |
| Knapp BESS | GoldenMax Energy Inc | BESS | Scurry | 10 MW | Under construction | 2026 | source ↗ |
| Meadow Park Energy Center | CleanAmps AssetCo LLC | BESS | Tarrant | 10 MW | Under construction | 2026 | source ↗ |
| BESS TX Camarine - BSHOU001 | Prologis Logistics Services Incorporated BESS | BESS | Harris | 10 MW | Under construction | 2026 | source ↗ |
| Harlingen #1 BESS 1 | Harlingen ESS Assets LLC | BESS | Cameron | 10 MW | Under construction | 2026 | source ↗ |
| BESS La Feria | Grenergy USA LLC | BESS | Cameron | 10 MW | Under construction | 2026 | source ↗ |
| BESS Stadium | Grenergy USA LLC | BESS | Jim Wells | 10 MW | Under construction | 2026 | source ↗ |
| Apple BESS | Apple Infra, LLC | BESS | Ector | 10 MW | Under construction | 2026 | source ↗ |
| Highway 6 BESS | Hwy 6 Infra LLC | BESS | Brazos | 10 MW | Under construction | 2026 | source ↗ |
| Buda BESS | Buda Infra LLC | BESS | Hays | 10 MW | Under construction | 2026 | source ↗ |
| Regis Escondido | Regis Escondido LLC | BESS | Maverick | 10 MW | Under construction | 2026 | source ↗ |
| Regis Hidden Valley | Regis Hidden Valley LLC | BESS | Harris | 10 MW | Under construction | 2026 | source ↗ |
| Regis Gears Harris | Regis Gears Harris LLC | BESS | Harris | 10 MW | Under construction | 2026 | source ↗ |
| Regis Laureles | Regis Laureles LLC | BESS | Cameron | 10 MW | Under construction | 2026 | source ↗ |
| Regis Leakey | Regis Leakey LLC | BESS | Real | 10 MW | Under construction | 2026 | source ↗ |
| Regis Lyssy | Regis Lyssy LLC | BESS | Karnes | 10 MW | Under construction | 2026 | source ↗ |
| Regis Medina | Regis Medina LLC | BESS | Bandera | 10 MW | Under construction | 2026 | source ↗ |
| Regis Medina Lake | Regis Medina Lake LLC | BESS | Bandera | 10 MW | Under construction | 2026 | source ↗ |
| Regis Milton | Regis Milton LLC | BESS | Karnes | 10 MW | Under construction | 2026 | source ↗ |
| Regis Utopia | Regis Utopia LLC | BESS | Bandera | 10 MW | Under construction | 2026 | source ↗ |
| DGS Five Points | Distributed Generation Solutions LLC | BESS | Taylor | 10 MW | Under construction | 2026 | source ↗ |
| Plaza Street | DGSP2 LLC | BESS | Taylor | 10 MW | Under construction | 2026 | source ↗ |
| SMT Dallas III BESS | SMT Dallas III LLC | BESS | Dallas | 10 MW | Under construction | 2026 | source ↗ |
| Aggreko MSR Grid PC2 | AETS AM LLC | BESS | Nueces | 10 MW | Under construction | 2026 | source ↗ |
| Aggreko MSR Grid PC5 | AETS AM LLC | BESS | Cameron | 10 MW | Under construction | 2026 | source ↗ |
| Aggreko MSR Grid PC7 | AETS AM LLC | BESS | Cameron | 10 MW | Under construction | 2026 | source ↗ |
| Alamo Clean Energy Center (BESS) | On Energy Storage | BESS | Pecos | 10 MW | Under construction | 2026 | source ↗ |
| Fort Stockton Clean Energy Center (BESS) | On Energy Storage | BESS | Pecos | 10 MW | Under construction | 2026 | source ↗ |
| Cotulla BESS 1 | Marubeni Power International, Inc. | BESS | La Salle | 10 MW | Under construction | 2026 | source ↗ |
| Palmview BESS | Marubeni Power International, Inc. | BESS | Hidalgo | 10 MW | Under construction | 2026 | source ↗ |
| SE Edinburg BESS | Marubeni Power International, Inc. | BESS | Hidalgo | 10 MW | Under construction | 2026 | source ↗ |
| Triple Butte I | Triple Butte | BESS | Pecos | 8 MW | Operating | 2021 | source ↗ |
| Kingsberry Energy Storage System | Austin Energy | BESS | Travis | 2 MW | Operating | 2018 | source ↗ |
| Hoef's Road Storage | Anatolian Energy, LLC | BESS | Reeves | 2 MW | Operating | 2021 | source ↗ |
| Johnson City BESS | Pedernales Electric Coop, Inc | BESS | Blanco | 2 MW | Operating | 2020 | source ↗ |