18 tracked projects · 2,498 MW · 7 data centers, 11 battery (BESS) sites
Below is every data center and battery energy storage (BESS) project we track in Georgia, ranked by capacity. Battery projects are sourced from the federal EIA-860M inventory; data centers are hand-curated with a public source on each entry. See the methodology for details.
Working this market? Get every operator below as a ranked BD hunting list — an Excel workbook with operators sorted by capacity plus blank contact / priority / notes columns, ready to work. CSV + GeoJSON included.
Get the dataset — $4.99 →
All Georgia projects
| Project | Operator | Type | Location | Capacity | Status | Year | Source |
|---|---|---|---|---|---|---|---|
| McGrau Ford Battery Storage Facility | Georgia Power Co | BESS | Cherokee | 530 MW | Under construction | 2026 | source ↗ |
| Microsoft Atlanta | Microsoft | Data center | Palmetto | 400 MW | Under construction | 2026 | source ↗ |
| Meta Newton County | Meta | Data center | Newton County | 400 MW | Operating | 2018 | source ↗ |
| Pepper Hammock Solar and Storage | BrightNight Power | BESS | Wayne | 400 MW | Planned | 2028 | source ↗ |
| Stack Infrastructure Atlanta | Stack Infrastructure | Data center | Lithia Springs | 240 MW | Operating | 2022 | source ↗ |
| Robins Air Force Base Solar | Georgia Power Co | BESS | Bibb | 128 MW | Operating | 2026 | source ↗ |
| Cabokenze Energy Storage | Cabokenze Energy Storage, LLC | BESS | Burke | 76 MW | Planned | 2027 | source ↗ |
| Mossy Branch BESS | Georgia Power | BESS | Talbot County | 65 MW | Operating | 2023 | source ↗ |
| Hammond | Georgia Power Co | BESS | Floyd | 58 MW | Under construction | 2026 | source ↗ |
| Moody Air Force Base Solar | Georgia Power Co | BESS | Lowndes | 50 MW | Operating | 2026 | source ↗ |
| DataBank ATL2 | DataBank | Data center | Atlanta | 40 MW | Operating | 2019 | source ↗ |
| Hickory Park Solar Hybrid | RWE Clean Energy | BESS | Mitchell | 40 MW | Operating | 2022 | source ↗ |
| Cool Springs Solar (Hybrid) | Cool Springs Solar, LLC | BESS | Decatur | 40 MW | Operating | 2021 | source ↗ |
| Equinix AT1 Atlanta | Equinix | Data center | Atlanta | 20 MW | Operating | 2010 | source ↗ |
| Allatoona Substation #10 | Cobb Electric Membership Corporation | BESS | Cobb | 10 MW | Under construction | 2026 | source ↗ |
| Solar BESS Hybrid | Cobb Electric Membership Corporation | BESS | Cobb | 1 MW | Operating | 2020 | source ↗ |
| Google Douglas County | Data center | Douglas County | — | Operating | — | source ↗ | |
| Google LaGrange | Data center | LaGrange | — | Planned | — | source ↗ |