19 tracked projects · 2,598 MW · 8 data centers, 11 battery (BESS) sites
Below is every data center and battery energy storage (BESS) project we track in Georgia, ranked by capacity. Battery projects are sourced from the federal EIA-860M inventory; data centers are hand-curated with a public source on each entry. See the methodology for details.
Free sample — the 100 largest tracked projects
Every column we publish: operator, city, capacity (MW/MWh), status, year online and a public source on each row. Opens straight in Excel or Sheets. No card, no call.
One email with the file. No list, no drip sequence — see our privacy policy.
Working this market? 1 status change here in the latest refresh. Get every operator below as a ranked BD hunting list (Excel + CSV + GeoJSON) — $199 once, or $49/mo refreshed monthly with a row-level change log.
See data & pricing →
All Georgia projects
| Project | Operator | Type | Location | Capacity | Status | Year | Source |
|---|---|---|---|---|---|---|---|
| McGrau Ford Battery Storage Facility | Georgia Power Co | BESS | Cherokee | 530 MW | Operating | 2026 | source ↗ |
| Microsoft Fairwater Atlanta | Microsoft | Data center | Palmetto | 400 MW | Operating | 2025 | source ↗ |
| Meta Newton County | Meta | Data center | Newton County | 400 MW | Operating | 2018 | source ↗ |
| Pepper Hammock Solar and Storage | BrightNight Power | BESS | Wayne | 400 MW | Planned | 2029 | source ↗ |
| Stack Infrastructure Atlanta | Stack Infrastructure | Data center | Lithia Springs | 240 MW | Operating | 2022 | source ↗ |
| Robins Air Force Base Solar | Georgia Power Co | BESS | Bibb | 128 MW | Operating | 2026 | source ↗ |
| Google LaGrange | Data center | LaGrange | 100 MW | Planned | — | source ↗ | |
| Cabokenze Energy Storage | Cabokenze Energy Storage, LLC | BESS | Burke | 76 MW | Planned | 2027 | source ↗ |
| Mossy Branch BESS | Georgia Power | BESS | Talbot County | 65 MW | Operating | 2023 | source ↗ |
| Hammond | Georgia Power Co | BESS | Floyd | 58 MW | Under construction | 2026 | source ↗ |
| Moody Air Force Base Solar | Georgia Power Co | BESS | Lowndes | 50 MW | Operating | 2026 | source ↗ |
| DataBank ATL2 | DataBank | Data center | Atlanta | 40 MW | Operating | 2019 | source ↗ |
| Hickory Park Solar Hybrid | RWE Clean Energy | BESS | Mitchell | 40 MW | Operating | 2022 | source ↗ |
| Cool Springs Solar (Hybrid) | Cool Springs Solar, LLC | BESS | Decatur | 40 MW | Operating | 2021 | source ↗ |
| Equinix AT1 Atlanta | Equinix | Data center | Atlanta | 20 MW | Operating | 2010 | source ↗ |
| Allatoona Substation #10 | Cobb Electric Membership Corporation | BESS | Cobb | 10 MW | Operating | 2026 | source ↗ |
| Solar BESS Hybrid | Cobb Electric Membership Corporation | BESS | Cobb | 1 MW | Operating | 2020 | source ↗ |
| Google Douglas County | Data center | Douglas County | — | Operating | — | source ↗ | |
| AWS Georgia (Butts / Douglas Counties) | Amazon Web Services | Data center | Butts County | — | Planned | — | source ↗ |