Hybrid-Electric Building Technologies West Los Angeles 1, LLC — tracked projects
7 projects · 13 MW · 1 states
Every Hybrid-Electric Building Technologies West Los Angeles 1, LLC data center and battery storage project we track, ranked by capacity. See the methodology for how this data is sourced and defined.
View Hybrid-Electric Building Technologies West Los Angeles 1, LLC on the map →
All Hybrid-Electric Building Technologies West Los Angeles 1, LLC projects
| Project | Type | Location | Capacity | Status | Year | Source |
|---|---|---|---|---|---|---|
| OCSD | BESS | Orange, CA | 5 MW | Operating | 2019 | source ↗ |
| Allergan | BESS | Orange, CA | 2 MW | Operating | 2019 | source ↗ |
| Downey | BESS | Los Angeles, CA | 2 MW | Operating | 2019 | source ↗ |
| Baker | BESS | Orange, CA | 1 MW | Operating | 2019 | source ↗ |
| DATS | BESS | Orange, CA | 1 MW | Operating | 2017 | source ↗ |
| LAWRP | BESS | Orange, CA | 1 MW | Operating | 2019 | source ↗ |
| SOCCD | BESS | Orange, CA | 1 MW | Operating | 2019 | source ↗ |